1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/19/00336/OUT

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Outline Application
Date Received:05 / 02 / 2019
Registration (Validation) Date:21 / 02 / 2019
Consultation Start Date:21 / 02 / 2019
Earliest Decision Date (Consultation Period Expires):26 / 08 / 2019
Target Date for Decision:23 / 05 / 2019
Location:Land off Cambridge Road, Langford , Biggleswade, SG18 9SH
Parish Name:Langford
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Outline Application - for the erection of up to 150 dwellings with public open space, landscaping and sustainable drainage system (SuDS) and vehicular access point from Cambridge Road. All matters reserved except for means of vehicular access into the site.
Case Officer:Debbie Quinn
Case Officer Tel:0300 300 5723
Case Officer Email:debbie.quinn@centralbedfordshire.gov.uk
Status:Decided
Agent:Not available
Press Date:08 / 03 / 2019
Site Notice Date:No date
NeighboursResponses Received: 126
and Representatives:In Favour: 2
Representation DetailsAgainst: 121
Comments: 3
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:06/03/2019
Committee Site Visit Date:No date
Committee Meeting Date:11 / 09 / 2019
Decision Level:Development Management Committee
Date Decision Made:19 / 04 / 2021
Date Decision Despatched:19 / 04 / 2021
Decision:Outline Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )This permission is subject to a legal obligation under Section 106 of the Town and Country Planning Act 1990.This permission is subject to a legal obligation under Section 106 of the Town and Country Planning Act 1990.
4 )The applicant is advised that in order to comply with Conditions 4 and 6 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail  highwaysagreements@centralbedfordshire.gov.ukThe applicant is advised that in order to comply with Conditions 4 and 6 of this permission it will be necessary for the developer of the site to enter into an agreement with Central Bedfordshire Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. You are advised to contact the Highways Agreements Officer, Community Services, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford SG17 5TQ. E-mail  highwaysagreements@centralbedfordshire.gov.uk
5 )To discharge condition 22, the applicant is advised that the following points will have to be addressed within the submission: (A) A 40% climate change allowance is required as well as 10% urban creep. (FRA mitigation measures states 30% also quoted at 5.1.3). (B) Also required is a full set of calculations, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC+10% Urban Creep). Any exceedance should be shown with pathways with maximum depths and velocity. (C)Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. (D) Full drainage drawings showing all connections, control features, storage, inverts etc are required. (E) Detailed site investigation results (including any site specific soakage tests and ground water monitoring shown in accordance with BRE 365) will need to be provided with the detailed design. This could be per phase or strategic, either way if it is used for that phase drainage it will need assessing. (F) Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement'. (G) The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). (H) To ensure future homeowners and subsequent homeowners will be aware of any maintenance requirements / responsibilities for surface water drainage, including ditches; further measures should be proposed by the applicant and may include, for example, information provided to the first purchaser of the property and also designation/registration of the SuDS so that it appears as a Land Charge for the property and as such is identified to subsequent purchasers of the property. (I) Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. This is obtained from the IDB, who consider consents and discharge rates on behalf of CBC. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.To discharge condition 22, the applicant is advised that the following points will have to be addressed within the submission: (A) A 40% climate change allowance is required as well as 10% urban creep. (FRA mitigation measures states 30% also quoted at 5.1.3). (B) Also required is a full set of calculations, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC+10% Urban Creep). Any exceedance should be shown with pathways with maximum depths and velocity. (C)Any watercourses within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. (D) Full drainage drawings showing all connections, control features, storage, inverts etc are required. (E) Detailed site investigation results (including any site specific soakage tests and ground water monitoring shown in accordance with BRE 365) will need to be provided with the detailed design. This could be per phase or strategic, either way if it is used for that phase drainage it will need assessing. (F) Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement'. (G) The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). (H) To ensure future homeowners and subsequent homeowners will be aware of any maintenance requirements / responsibilities for surface water drainage, including ditches; further measures should be proposed by the applicant and may include, for example, information provided to the first purchaser of the property and also designation/registration of the SuDS so that it appears as a Land Charge for the property and as such is identified to subsequent purchasers of the property. (I) Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. This is obtained from the IDB, who consider consents and discharge rates on behalf of CBC. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.
6 )Network Rail have provided the following advice in their consultation response of 25th Match 2019: Drainage We ask that all surface and foul water drainage from the development area be directed away from Network Rail's retained land and structures into suitable drainage systems, the details of which are to be approved by Network Rail before construction starts on site. Water must not be caused to pond on or near railway land either during or after any construction-related activity. The construction of soakaways for storm or surface water drainage should not take place within 20m of the Network Rail boundary. Any new drains are to be constructed and maintained so as not to have any adverse effect upon the stability of any Network Rail equipment, structure, cutting or embankment. The construction of soakaways within any lease area is not permitted. The construction of surface water retention ponds/tanks, SuDS or flow control systems should not take place within 20m of the Network Rail boundary where these systems are proposed to be below existing track level. Full overland flow conditions should be submitted to Network Rail for approval prior to any works on site commencing. The construction of surface water retention ponds/tanks, SuDS or flow control systems should not take place within 30m of the Network Rail boundary where these systems are proposed to be above existing track level. Full overland flow conditions should be submitted to Network Rail for approval prior to any works on site commencing. If a Network Rail-owned underline structure (such as a culvert, pipe or drain) is intended to act as a means of conveying surface water within or away from the development, then all parties must work together to ensure that the structure is fit for purpose and able to take the proposed flows without risk to the safety of the railway or the surrounding land. Wayleaves and or easements for underline drainage assets The position of any underline drainage asset shall not be within 5m of drainage assets, sensitive operational equipment such as switches and crossings, track joints, welds, overhead line stanchions and line side equipment, and not within 15m of bridges, culverts, retaining walls and other structures supporting railway live loading. Protection of existing railway drainage assets within a clearance area There are likely to be existing railway drainage assets in the vicinity of the proposed works. Please proceed with caution. No connection of drainage shall be made to these assets without Network Rail's prior consent to detailed proposals. Any works within 5m of the assets will require prior consent. There must be no interfering with existing drainage assets/systems without Network Rail's written permission. The developer is asked to ascertain with Network Rail the existence of any existing railway drainage assets or systems in the vicinity of the development area before work starts on site. Please contact Matthew Shelton (matthew.shelton@networkrail.co.uk) for further information and assistance. Fail Safe Use of Crane and Plant All operations, including the use of cranes or other mechanical plant working adjacent to Network Rail's property, must at all times be carried out in a 'fail safe' manner such that in the event of mishandling, collapse or failure, no materials or plant are capable of falling within 3.0m of the nearest rail of the adjacent railway line, or where the railway is electrified, within 3.0m of overhead electrical equipment or supports. Excavations/Earthworks All excavations/ earthworks carried out in the vicinity of Network Rail property/ structures must be designed and executed such that no interference with the integrity of that property/ structure can occur. If temporary works compounds are to be located adjacent to the operational railway, these should be included in a method statement for approval by Network Rail. Prior to commencement of works, full details of excavations and earthworks to be carried out near the railway undertaker's boundary fence should be submitted for the approval of the Local Planning Authority acting in consultation with the railway undertaker and the works shall only be carried out in accordance with the approved details. Where development may affect the railway, consultation with the Asset Protection Project Manager should be undertaken. Network Rail will not accept any liability for any settlement, disturbance or damage caused to any development by failure of the railway infrastructure nor for any noise or vibration arising from the normal use and/or maintenance of the operational railway. No right of support is given or can be claimed from Network Rails infrastructure or railway land. Security of Mutual Boundary Security of the railway boundary will need to be maintained at all times. If the works require temporary or permanent alterations to the mutual boundary the applicant must contact Network Rail's Asset Protection Project Manager. Fencing Because of the nature of the proposed developments we consider that there will be an increased risk of trespass onto the railway. The Developer must provide a suitable trespass proof fence adjacent to Network Rail's boundary (minimum approx. 1.8m high) and make provision for its future maintenance and renewal. Network Rail's existing fencing / wall must not be removed or damaged. Method Statements/Fail Safe/Possessions Method statements may require to be submitted to Network Rail's Asset Protection Project Manager at the below address for approval prior to works commencing on site. This should include an outline of the proposed method of construction, risk assessment in relation to the railway and construction traffic management plan. Where appropriate an asset protection agreement will have to be entered into. Where any works cannot be carried out in a 'fail-safe' manner, it will be necessary to restrict those works to periods when the railway is closed to rail traffic i.e. 'possession' which must be booked via Network Rail's Asset Protection Project Manager and are subject to a minimum prior notice period for booking of 20 weeks. Generally if excavations/piling/buildings are to be located within 10m of the railway boundary a method statement should be submitted for NR approval. OPE Once planning permission has been granted and at least six weeks prior to works commencing on site the Asset Protection Project Manager (OPE) MUST be contacted, contact details as below. The OPE will require to see any method statements/drawings relating to any excavation, drainage, demolition, lighting and building work or any works to be carried out on site that may affect the safety, operation, integrity and access to the railway. Vibro-impact Machinery Where vibro-compaction machinery is to be used in development, details of the use of such machinery and a method statement should be submitted for the approval of the Local Planning Authority acting in consultation with the railway undertaker prior to the commencement of works and the works shall only be carried out in accordance with the approved method statement Scaffolding Any scaffold which is to be constructed within 10 metres of the railway boundary fence must be erected in such a manner that at no time will any poles over-sail the railway and protective netting around such scaffold must be installed. Two Metre Boundary Consideration should be given to ensure that the construction and subsequent maintenance can be carried out to any proposed buildings or structures without adversely affecting the safety of, or encroaching upon Network Rail's adjacent land, and therefore all/any building should be situated at least 2 metres from Network Rail's boundary. This will allow construction and future maintenance to be carried out from the applicant's land, thus reducing the probability of provision and costs of railway look-out protection, supervision and other facilities necessary when working from or on railway land. ENCROACHMENT The developer/applicant must ensure that their proposal, both during construction, and after completion of works on site, does not affect the safety, operation or integrity of the operational railway, Network Rail and its infrastructure or undermine or damage or adversely affect any railway land and structures. There must be no physical encroachment of the proposal onto Network Rail land, no over-sailing into Network Rail air-space and no encroachment of foundations onto Network Rail land and soil. There must be no physical encroachment of any foundations onto Network Rail land. Any future maintenance must be conducted solely within the applicant's land ownership. Should the applicant require access to Network Rail land then must seek approval from the Network Rail Asset Protection Team. Any unauthorised access to Network Rail land or air-space is an act of trespass and we would remind the council that this is a criminal offence (s55 British Transport Commission Act 1949). Should the applicant be granted access to Network Rail land then they will be liable for all costs incurred in facilitating the proposal. Noise/Soundproofing The Developer should be aware that any development for residential use adjacent to an operational railway may result in neighbour issues arising. Consequently every endeavour should be made by the developer to provide adequate soundproofing for each dwelling. Please note that in a worst case scenario there could be trains running 24 hours a day and the soundproofing should take this into account. Trees/Shrubs/Landscaping Where trees/shrubs are to be planted adjacent to the railway boundary these shrubs should be positioned at a minimum distance greater than their predicted mature height from the boundary. Certain broad leaf deciduous species should not be planted adjacent to the railway boundary. We would wish to be involved in the approval of any landscaping scheme adjacent to the railway. Where landscaping is proposed as part of an application adjacent to the railway it will be necessary for details of the landscaping to be known and approved to ensure it does not impact upon the railway infrastructure. Any hedge planted adjacent to Network Rail's boundary fencing for screening purposes should be so placed that when fully grown it does not damage the fencing or provide a means of scaling it. No hedge should prevent Network Rail from maintaining its boundary fencing. Lists of trees that are permitted and those that are not permitted are provided below and these should be added to any tree planting conditions: Acceptable: Birch (Betula), Crab Apple (Malus Sylvestris), Field Maple (Acer Campestre), Bird Cherry (Prunus Padus), Wild Pear (Pyrs Communis), Fir Trees Pines (Pinus), Hawthorne (Cretaegus), Mountain Ash Whitebeams (Sorbus), False Acacia (Robinia), Willow Shrubs (Shrubby Salix), Thuja Plicatat 'Zebrina' Not Acceptable: Acer (Acer pseudoplantanus), Aspen Poplar (Populus), Small-leaved Lime (Tilia Cordata), Sycamore Norway Maple (Acer), Horse Chestnut (Aesculus Hippocastanum), Sweet Chestnut (Castanea Sativa), Ash (Fraxinus excelsior), Black poplar (Populus nigra var, betulifolia), Lombardy Poplar (Populus nigra var, italica), Large-leaved lime (Tilia platyphyllos), Common line (Tilia x europea) A comprehensive list of permitted tree species is available upon request. Lighting Where new lighting is to be erected adjacent to the operational railway the potential for train drivers to be dazzled must be eliminated. In addition the location and colour of lights must not give rise to the potential for confusion with the signalling arrangements on the railway. Detail of any external lighting should be provided as a condition if not already indicated on the application. Access to Railway All roads, paths or ways providing access to any part of the railway undertaker's land shall be kept open at all times during and after the development. In particular, the railway access point to the North East corner of the railway bridge on Cambridge Road must remain clear and unobstructed at all times both during and after construction works at the site. Children's Play Areas/Open Spaces/Amenities Children's play areas, open spaces and amenity areas must be protected by a secure fence along the boundary of one of the following kinds, concrete post and panel, iron railings, steel palisade or such other fence approved by the Local Planning Authority acting in consultation with the railway undertaker to a minimum height of 1.8 metres and the fence should not be able to be climbed. Network Rail is required to recover all reasonable costs associated with facilitating these works.Network Rail have provided the following advice in their consultation response of 25th Match 2019: Drainage We ask that all surface and foul water drainage from the development area be directed away from Network Rail's retained land and structures into suitable drainage systems, the details of which are to be approved by Network Rail before construction starts on site. Water must not be caused to pond on or near railway land either during or after any construction-related activity. The construction of soakaways for storm or surface water drainage should not take place within 20m of the Network Rail boundary. Any new drains are to be constructed and maintained so as not to have any adverse effect upon the stability of any Network Rail equipment, structure, cutting or embankment. The construction of soakaways within any lease area is not permitted. The construction of surface water retention ponds/tanks, SuDS or flow control systems should not take place within 20m of the Network Rail boundary where these systems are proposed to be below existing track level. Full overland flow conditions should be submitted to Network Rail for approval prior to any works on site commencing. The construction of surface water retention ponds/tanks, SuDS or flow control systems should not take place within 30m of the Network Rail boundary where these systems are proposed to be above existing track level. Full overland flow conditions should be submitted to Network Rail for approval prior to any works on site commencing. If a Network Rail-owned underline structure (such as a culvert, pipe or drain) is intended to act as a means of conveying surface water within or away from the development, then all parties must work together to ensure that the structure is fit for purpose and able to take the proposed flows without risk to the safety of the railway or the surrounding land. Wayleaves and or easements for underline drainage assets The position of any underline drainage asset shall not be within 5m of drainage assets, sensitive operational equipment such as switches and crossings, track joints, welds, overhead line stanchions and line side equipment, and not within 15m of bridges, culverts, retaining walls and other structures supporting railway live loading. Protection of existing railway drainage assets within a clearance area There are likely to be existing railway drainage assets in the vicinity of the proposed works. Please proceed with caution. No connection of drainage shall be made to these assets without Network Rail's prior consent to detailed proposals. Any works within 5m of the assets will require prior consent. There must be no interfering with existing drainage assets/systems without Network Rail's written permission. The developer is asked to ascertain with Network Rail the existence of any existing railway drainage assets or systems in the vicinity of the development area before work starts on site. Please contact Matthew Shelton (matthew.shelton@networkrail.co.uk) for further information and assistance. Fail Safe Use of Crane and Plant All operations, including the use of cranes or other mechanical plant working adjacent to Network Rail's property, must at all times be carried out in a 'fail safe' manner such that in the event of mishandling, collapse or failure, no materials or plant are capable of falling within 3.0m of the nearest rail of the adjacent railway line, or where the railway is electrified, within 3.0m of overhead electrical equipment or supports. Excavations/Earthworks All excavations/ earthworks carried out in the vicinity of Network Rail property/ structures must be designed and executed such that no interference with the integrity of that property/ structure can occur. If temporary works compounds are to be located adjacent to the operational railway, these should be included in a method statement for approval by Network Rail. Prior to commencement of works, full details of excavations and earthworks to be carried out near the railway undertaker's boundary fence should be submitted for the approval of the Local Planning Authority acting in consultation with the railway undertaker and the works shall only be carried out in accordance with the approved details. Where development may affect the railway, consultation with the Asset Protection Project Manager should be undertaken. Network Rail will not accept any liability for any settlement, disturbance or damage caused to any development by failure of the railway infrastructure nor for any noise or vibration arising from the normal use and/or maintenance of the operational railway. No right of support is given or can be claimed from Network Rails infrastructure or railway land. Security of Mutual Boundary Security of the railway boundary will need to be maintained at all times. If the works require temporary or permanent alterations to the mutual boundary the applicant must contact Network Rail's Asset Protection Project Manager. Fencing Because of the nature of the proposed developments we consider that there will be an increased risk of trespass onto the railway. The Developer must provide a suitable trespass proof fence adjacent to Network Rail's boundary (minimum approx. 1.8m high) and make provision for its future maintenance and renewal. Network Rail's existing fencing / wall must not be removed or damaged. Method Statements/Fail Safe/Possessions Method statements may require to be submitted to Network Rail's Asset Protection Project Manager at the below address for approval prior to works commencing on site. This should include an outline of the proposed method of construction, risk assessment in relation to the railway and construction traffic management plan. Where appropriate an asset protection agreement will have to be entered into. Where any works cannot be carried out in a 'fail-safe' manner, it will be necessary to restrict those works to periods when the railway is closed to rail traffic i.e. 'possession' which must be booked via Network Rail's Asset Protection Project Manager and are subject to a minimum prior notice period for booking of 20 weeks. Generally if excavations/piling/buildings are to be located within 10m of the railway boundary a method statement should be submitted for NR approval. OPE Once planning permission has been granted and at least six weeks prior to works commencing on site the Asset Protection Project Manager (OPE) MUST be contacted, contact details as below. The OPE will require to see any method statements/drawings relating to any excavation, drainage, demolition, lighting and building work or any works to be carried out on site that may affect the safety, operation, integrity and access to the railway. Vibro-impact Machinery Where vibro-compaction machinery is to be used in development, details of the use of such machinery and a method statement should be submitted for the approval of the Local Planning Authority acting in consultation with the railway undertaker prior to the commencement of works and the works shall only be carried out in accordance with the approved method statement Scaffolding Any scaffold which is to be constructed within 10 metres of the railway boundary fence must be erected in such a manner that at no time will any poles over-sail the railway and protective netting around such scaffold must be installed. Two Metre Boundary Consideration should be given to ensure that the construction and subsequent maintenance can be carried out to any proposed buildings or structures without adversely affecting the safety of, or encroaching upon Network Rail's adjacent land, and therefore all/any building should be situated at least 2 metres from Network Rail's boundary. This will allow construction and future maintenance to be carried out from the applicant's land, thus reducing the probability of provision and costs of railway look-out protection, supervision and other facilities necessary when working from or on railway land. ENCROACHMENT The developer/applicant must ensure that their proposal, both during construction, and after completion of works on site, does not affect the safety, operation or integrity of the operational railway, Network Rail and its infrastructure or undermine or damage or adversely affect any railway land and structures. There must be no physical encroachment of the proposal onto Network Rail land, no over-sailing into Network Rail air-space and no encroachment of foundations onto Network Rail land and soil. There must be no physical encroachment of any foundations onto Network Rail land. Any future maintenance must be conducted solely within the applicant's land ownership. Should the applicant require access to Network Rail land then must seek approval from the Network Rail Asset Protection Team. Any unauthorised access to Network Rail land or air-space is an act of trespass and we would remind the council that this is a criminal offence (s55 British Transport Commission Act 1949). Should the applicant be granted access to Network Rail land then they will be liable for all costs incurred in facilitating the proposal. Noise/Soundproofing The Developer should be aware that any development for residential use adjacent to an operational railway may result in neighbour issues arising. Consequently every endeavour should be made by the developer to provide adequate soundproofing for each dwelling. Please note that in a worst case scenario there could be trains running 24 hours a day and the soundproofing should take this into account. Trees/Shrubs/Landscaping Where trees/shrubs are to be planted adjacent to the railway boundary these shrubs should be positioned at a minimum distance greater than their predicted mature height from the boundary. Certain broad leaf deciduous species should not be planted adjacent to the railway boundary. We would wish to be involved in the approval of any landscaping scheme adjacent to the railway. Where landscaping is proposed as part of an application adjacent to the railway it will be necessary for details of the landscaping to be known and approved to ensure it does not impact upon the railway infrastructure. Any hedge planted adjacent to Network Rail's boundary fencing for screening purposes should be so placed that when fully grown it does not damage the fencing or provide a means of scaling it. No hedge should prevent Network Rail from maintaining its boundary fencing. Lists of trees that are permitted and those that are not permitted are provided below and these should be added to any tree planting conditions: Acceptable: Birch (Betula), Crab Apple (Malus Sylvestris), Field Maple (Acer Campestre), Bird Cherry (Prunus Padus), Wild Pear (Pyrs Communis), Fir Trees Pines (Pinus), Hawthorne (Cretaegus), Mountain Ash Whitebeams (Sorbus), False Acacia (Robinia), Willow Shrubs (Shrubby Salix), Thuja Plicatat 'Zebrina' Not Acceptable: Acer (Acer pseudoplantanus), Aspen Poplar (Populus), Small-leaved Lime (Tilia Cordata), Sycamore Norway Maple (Acer), Horse Chestnut (Aesculus Hippocastanum), Sweet Chestnut (Castanea Sativa), Ash (Fraxinus excelsior), Black poplar (Populus nigra var, betulifolia), Lombardy Poplar (Populus nigra var, italica), Large-leaved lime (Tilia platyphyllos), Common line (Tilia x europea) A comprehensive list of permitted tree species is available upon request. Lighting Where new lighting is to be erected adjacent to the operational railway the potential for train drivers to be dazzled must be eliminated. In addition the location and colour of lights must not give rise to the potential for confusion with the signalling arrangements on the railway. Detail of any external lighting should be provided as a condition if not already indicated on the application. Access to Railway All roads, paths or ways providing access to any part of the railway undertaker's land shall be kept open at all times during and after the development. In particular, the railway access point to the North East corner of the railway bridge on Cambridge Road must remain clear and unobstructed at all times both during and after construction works at the site. Children's Play Areas/Open Spaces/Amenities Children's play areas, open spaces and amenity areas must be protected by a secure fence along the boundary of one of the following kinds, concrete post and panel, iron railings, steel palisade or such other fence approved by the Local Planning Authority acting in consultation with the railway undertaker to a minimum height of 1.8 metres and the fence should not be able to be climbed. Network Rail is required to recover all reasonable costs associated with facilitating these works.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page