| Conditions or Reasons: | 1)
Before development begins, the approval of the District Planning Authority shall be obtained in respect of all of the reserved matters, namely the siting, design, external appearance, means of access, and landscaping of the site. REASON: To comply with Article 3(1) of the Town and Country Planning (General Development Procedure) Order 1995. |
2)
a) Application for the approval of the reserved matters shall be made to the District Planning Authority within three years from the date of this permission; b) The development shall begin not later than whichever is the later of the following dates: i) five years from the date of this permission, or ii) two years from the final approval of the reserved matters or, if approved on different dates, the final approval of the last such matter to be approved. REASON: To comply with Section 92 of the Town and Country Planning Act 1990. |
3)
Before development begins, a landscaping scheme to include any hard surfaces and earth mounding shall be submitted to and approved in writing by the District Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season and maintained until satisfactorily established. REASON: To ensure a satisfactory standard of landscaping. (Policies 8, 10, B.S.P.; BE8, S.B.L.P.R). |
4)
Before development begins, a scheme for the parking of vehicles on the site shall be submitted to and approved in writing by the District Planning Authority. The scheme shall comply with the standards of the District Planning Authority and shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose. REASON: To ensure provision for car parking clear of the highway. (Policies 42, B.S.P & T10, S.B.L.P.R). |
5)
This permission does not extend to the sketch layout submitted with the application. REASON: To avoid doubt. (Policies 10 B.S.P.; BE8 S.B.L.P.R) |
6)
Before development begins, the position of the proposed dwelling shall be pegged out on site and its position approved in writing by the District Planning Authority. REASON: To enable consideration to be given to the precise layout of the development. (Policies 10, B.S.P & BE8 S.B.L.P.R). |
7)
Development shall not begin until details of the junction of the proposed vehicular access with the highway have been approved by the District Planning Authority and no building shall be occupied until the junction has been constructed in accordance with the approved details. REASON: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. (Policies 42 B.S.P & T1 S.B.L.P.R). |
8)
The access shall have a minimum width of 4.1m. REASON: In the interest of road safety and for the avoidance of doubt. (Policies 42 B.S.P & T1 S.B.L.P.R). |
9)
Before the access is first brought into use a triangular vision splay shall be provided on each side of the new access and shall measure 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicant¿s control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level. REASON: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it. (Policies 42 B.S.P & T1 S.B.L.P.R) |
10)
Visibility splays shall be provided at the junction of the access with the public highway before the development is brought into use. The minimum dimensions to provide the required splay lines shall be 2m measured along the centre line of the proposed access from its junction with the channel of the public highway and 90m measured from the centre line of the proposed access along the line of the channel of the public highway. The required vision splays shall, on land in the applicant¿s control, be kept free of any obstruction exceeding a height of 1.05m. REASON: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it. (Policies 42 B.S.P & T1 S.B.L.P.R). |
11)
The proposed vehicular access shall be surfaced in bituminous or other similar durable material as may be approved in writing by the District Planning Authority for a distance of 10m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway. REASON: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety. (Policies 42 B.S.P & T1 S.B.L.P.R). |
12)
Any gates provided shall open away from the highway and be set back a distance of at least 5.0m from the nearside edge of the carriageway of the adjoining highway. REASON: To enable vehicles to draw off the highway before the gates are opened. (Policies 42 B.S.P & T1 S.B.L.P.R). |
13)
No development shall commence until wheel-cleaning facilities have been provided at all site exits in accordance with a scheme submitted to and approved in writing by the District Planning Authority. The approved facilities shall be installed and made operational before development commences and the Site Developer(s) shall ensure that all vehicles exiting the site use the approved wheel cleaning facilities. The wheel cleaning facilities shall be retained until the development has been substantially completed or until such time as the District Planning Authority is satisfied that the roadworks necessary to provide adequate and clean access to and from the public highway have been completed (apart from final surfacing). REASON: In the interests of the amenity and to prevent the deposit of mud or other extraneous material on the highway during the construction period. (Policies 42 B.S.P & T1 S.B.L.P.R). |
14)
Notwithstanding any details submitted with the application, the proposed dwellings shall be of a single storey height only. REASON: In order to limit the visual impact of the proposed development and to safeguard the living conditions of adjoining residents. (Policies 10 B.S.P & H2, BE8 S.B.L.P.R). |
15)
This permission relates only to the details shown on Drawing No. 13504 received 24/05/04 or to any subsequent appropriately endorsed revised plan. REASON: To identify the approved plan/s and to avoid doubt. |
|
|---|