<< Back to case
Conditions or Reasons for Planning Application - MB/01/00775/FULL
Conditions or Reasons:
1) 1. The development hereby approved shall be commenced within five years of the date of this permission. 2. No development shall take place until full details of both hard and soft landscape works have been submitted to and approved in writing by the Local Planning Authority and these works shall be carried out as approved. These details shall include:- i) means of enclosure; ii) materials to be used for any hard surfacing; iii) planting plans, including schedule of size, species, positions, density and times of planting; iv) details of existing trees and hedgerows on the site, indicating those to be retained and the method of their protection during development works. 3. The planting which shall have been approved consequent upon the submission of the scheme in accordance with Condition 2 above shall be carried out by a date which shall be not later than the end of the full planting season immediately following the completion of the development. Thereafter the planting shall be adequately maintained for a period of five years from the date of planting. Any of the trees or shrubs or both which die or are removed, or which become severely damaged or seriously diseased (during the said period of five years) shall be replaced with trees or shrubs or both, as the case may be, of similar size and species to those originally required to be planted and the same shall be maintained until properly established. 4. Details of the method of disposal of foul and surface water drainage shall be submitted to and agreed in writing by the Local Planning Authority including any land drainage system, before the development is commenced. Thereafter no part of the development shall be brought into use until the approved drainage scheme has been implemented. 5. Details of the materials to be used for the external walls and roof shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby permitted. Reasons ------- 1. To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out. 2. In order to ensure that the landscaping is carried out within a reasonable period in the interest of the visual amenities of the area. 3. In order to ensure that the planting is carried out within a reasonable period in the interest of the visual amenities of the area. 4. To ensure that adequate foul and surface water drainage is provided and that existing and future land drainage needs are protected. 5. To protect the visual amenities of the building and of the area generally. Signed...................... Date of Decision 17th July, 2001. Head of Planning Services


Return to Search | Close WindowTop of Page