<< Back to case
Conditions or Reasons for Planning Application - SB/04/01608
Conditions or Reasons:
1) The development shall begin not later than five years from the date of this permission.
REASON: To comply with Section 91 of the Town and Country Planning Act 1990.
2) New external brickwork and roofing materials shall match those of the existing building as closely as possible.
REASON: To ensure that the development is in keeping with the existing building.
(Policies 10, B.S.P.; BE8 & H8 S.B.L.P.R).
3) The building shall only be used for purposes incidental to the enjoyment of the dwelling.
REASON: To prevent the introduction of an inappropriate use harmful to the residential character of the area.
(Policy BE8 S.B.L.P.R)
4) The proposed vehicular access shall be surfaced in bituminous or other similar durable material as may be approved in writing by the District Planning Authority for a distance of 6m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
REASON: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety.
(Policies 42 B.S.P & T1 S.B.L.P.R).
5) This permission relates only to the details shown on Drawing no. 0424/2/A received 06/12/04 or to any subsequent appropriately endorsed revised plan.
REASON: To identify the approved plan/s and to avoid doubt.


Return to Search | Close WindowTop of Page