Conditions or Reasons for Planning Application - SB/05/00012/FULL
Conditions or Reasons:
1) The development shall begin not later than five years from the date of this permission.
REASON: To comply with Section 91 of the Town and Country Planning Act 1990.
2) Before development begins, a landscaping scheme to include any hard surfaces and earth mounding shall be submitted to and approved in writing by the District Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season and maintained until satisfactorily established.
REASON: To ensure a satisfactory standard of landscaping.
(Policies 8, 10, B.S.P.; BE8, S.B.L.P.R).
3) Before development begins, a scheme for the parking of vehicles on the site shall be submitted to and approved in writing by the District Planning Authority. The scheme shall comply with the standards of the District Planning Authority and shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose.
REASON: To ensure provision for car parking clear of the highway.
(Policies 42, B.S.P & T10, S.B.L.P.R).
4) Before development begins, samples of the materials to be used for the external walls and roofs of all new buildings shall be submitted to and approved in writing by the District Planning Authority.
REASON: To control the appearance of the building/s.
(Policies 10, B.S.P.; BE8 & H8, S.B.L.P.R).
5) Before development begins, a scheme for screen fencing and/or screen walling shall be submitted to and approved in writing by the District Planning Authority. The approved scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained.
REASON: To safeguard the amenity of the area.
(Policies 10 B.S.P.& BE8 S.B.L.P.R)
6) Before development begins, details of the levels of the proposed dwellings shall be submitted to and approved in writing by the District Planning Authority, and development shall thereafter be implemented accordingly.
REASON: To produce a satisfactory relationship between the various elements of the scheme and adjacent properties.
(Policy BE8 S.B.L.P.R)
7) Before development begins, the positions of the proposed dwellings shall be pegged out on site and their positions approved in writing by the District Planning Authority.
REASON: To enable consideration to be given to the precise layout of the development.
(Policies 10, B.S.P & BE8 S.B.L.P.R).
8) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building/s hereby permitted shall be carried out without the grant of further specific permission from the District Planning Authority.
REASON: To control the external appearance of the building/s in the interests of the amenities of the area.
(Policies 10 B.S.P & BE8 S.B.L.P.R).
9) Before the access is first brought into use a triangular vision splay shall be provided on each side of the new access and shall measure 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicant¿s control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.
REASON: To provide adequate visibility between the existing highway and the proposed access(es), and to make the access(es) safe and convenient for the traffic which is likely to use it (them).
(Policies 42 B.S.P & T1 S.B.L.P.R)
10) The proposed vehicular access shall be surfaced in bituminous or other similar durable material as may be approved in writing by the District Planning Authority for a distance of 6m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
REASON: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety.
(Policies 42 B.S.P & T1 S.B.L.P.R).
11) The maximum gradient of the vehicular access shall be 10% (1 in 10).
REASON: In the interests of the safety of persons using the access and users of the highway.
(Policies 42 B.S.P & T1 S.B.L.P.R).
12) Before the new access is first brought into use, any existing access within the frontage of the land to be developed, not incorporated in the access hereby approved shall be closed in a manner to the District Planning Authority¿s written approval.
REASON: In the interest of road safety and to reduce the number of points at which traffic will enter and leave the public highway.
(Policies 42 B.S.P & T1 S.B.L.P.R).
13) No development shall commence until wheel-cleaning facilities have been provided at all site exits in accordance with a scheme submitted to and approved in writing by the District Planning Authority. The approved facilities shall be installed and made operational before development commences and the Site Developer(s) shall ensure that all vehicles exiting the site use the approved wheel cleaning facilities. The wheel cleaning facilities shall be retained until the development has been substantially completed or until such time as the District Planning Authority is satisfied that the roadworks necessary to provide adequate and clean access to and from the public highway have been completed (apart from final surfacing).
REASON: In the interests of the amenity and to prevent the deposit of mud or other extraneous material on the highway during the construction period.
(Policies 42 B.S.P & T1 S.B.L.P.R).
14) This permission relates only to the details shown on Drawings received 10/01/05 or to any subsequent appropriately endorsed revised plan.
REASON: To identify the approved plan/s and to avoid doubt.