<< Back to case
Conditions or Reasons for Planning Application - SB/05/00609
Conditions or Reasons:
1) The development shall begin not later than five years from the date of this permission.
REASON: To comply with Section 91 of the Town and Country Planning Act 1990.
2) Before development begins, a landscaping scheme to include any hard surfaces and earth mounding shall be submitted to and approved in writing by the District Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season and maintained until satisfactorily established.
REASON: To ensure a satisfactory standard of landscaping.
(Policies 8, 10, B.S.P.; BE8, S.B.L.P.R).
3) Before the development is first occupied or brought into use, the parking scheme shown on Drawing CS 2005/1 shall be completed and thereafter retained for this purpose.
REASON: To ensure provision for car parking clear of the highway.
(Policies 42, B.S.P & T10, S.B.L.P.R).
4) Before development begins, samples of the materials to be used for the external walls and roofs of all new buildings shall be submitted to and approved in writing by the District Planning Authority.
REASON: To control the appearance of the building/s.
(Policies 10, B.S.P.; BE8 & H8, S.B.L.P.R).
5) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building/s hereby permitted shall be carried out without the grant of further specific permission from the District Planning Authority.
REASON: To control the external appearance of the building/s in the interests of the amenities of the area.
(Policies 10 B.S.P & BE8 S.B.L.P.R).
6) Development shall not begin until details of the proposed vehicular access with the carriageway of Manor Road have been approved by the District Planning Authority and no building shall be occupied until the access has been constructed in accordance with the approved details.
REASON: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
(Policies 42 B.S.P & T1 S.B.L.P.R).
7) Before the access is first brought into use a triangular vision splay shall be provided on each side of the new access and shall measure 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicant¿s control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.
REASON: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it.
(Policies 42 B.S.P & T1 S.B.L.P.R)
8) The proposed vehicular access shall be surfaced in bituminous or other similar durable material as may be approved in writing by the District Planning Authority for a distance of 5.0m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
REASON: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety.
(Policies 42 B.S.P & T1 S.B.L.P.R).
9) The development shall only be carried out in complete accordance with the approved plans and specifications.
REASON: To ensure no variation from the approved plans.
(Policies 10, B.S.P & BE8 S.B.L.P.R).
10) This permission relates only to the details shown on Drawing CS 2005/1 received 10/06/05 or to any subsequent appropriately endorsed revised plan.
REASON: To identify the approved plan/s and to avoid doubt.


Return to Search | Close WindowTop of Page