<< Back to case
Conditions or Reasons for Planning Application - MB/03/01337/OUT
Conditions or Reasons:
1) Approval of the details of:-

(a) the siting of the building(s);
(b) the design of the building(s);
(c) the external appearance of the building(s);
(d) the landscaping of the site;

(hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority in writing before any development is commenced. Plans and particulars of all of the reserved matters referred to above shall be submitted in writing to the Local Planning Authority and shall be carried out as approved.

Reason: To enable the Local Planning Authority to exercise control over the said matters which are not particularised in the application for planning permission in accordance with Section 92 of the Town and Country Planning Act 1990 and Town and Country Planning (General Development Procedure) Order 1995.
2) Application for approval of the reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission.

Reason: To comply with the provisions of Section 92 (2) (a) and (4) of the Town and Country Planning Act 1990.
3) The development hereby permitted shall be begun either before the expiration of five years from the date of this permission, or before the expiration of two years from the date of approval of the last of the reserved matters to be approved, whichever is the later.

Reason: To comply with the provisions of Sections 92 (2) (b) and (4) of the Town and Country Planning Act 1990.
4) The permission shall extend only to the application as amended by plans received on 21 August 2003.

Reason: For the avoidance of doubt and to ensure that the development is implemented in accordance with the plans formally approved by the Local Planning Authority.
5) Before the premises are occupied all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and of the premises.
6) The turning space for vehicles illustrated on the approved Plan (No. 03/735/02 Rev A) shall be constructed before the development is first brought into use.

Reason: To enable vehicles to draw off, park and turn outside of the highway limits thereby avoiding the reversing of vehicles onto the highway.
7) Details of the method of disposal of foul and surface water drainage shall be submitted to and agreed in writing by the Local Planning Authority including any land drainage system, before the development is commenced. Thereafter no part of the development shall be brought into use until the approved drainage scheme has been implemented.

Reason: To ensure that adequate foul and surface water drainage is provided and that existing and future land drainage needs are protected.


Return to Search | Close WindowTop of Page