<< Back to case
Conditions or Reasons for Planning Application - MB/05/00154/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within five years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) The proposed vehicular access shall be surfaced in bituminous or other similar durable material for a distance of 5 m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety.


Return to Search | Close WindowTop of Page