<< Back to case
Conditions or Reasons for Planning Application - MB/05/00711/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within five years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match/complement the existing building(s) and the visual amenities of the locality.
3) The conservatory shall be provided with a gas membrane (e.g. 1200 gauge polythene membrane) to be continuous across the floor slab and cavities and sealed at all joins and lapped to wall cavity DPC.

Reason: In the interests of the health and safety of the occupiers of the dwelling.


Return to Search | Close WindowTop of Page