Conditions or Reasons for Planning Application - MB/05/01767/OUT
Conditions or Reasons:
1) Approval of the details of:-

(a) the design of the buildings;
(b) the external appearance of the buildings;
(c) the landscaping of the site;

(hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority in writing before any development is commenced. Plans and particulars of all of the reserved matters referred to above shall be submitted in writing to the Local Planning Authority and shall be carried out as approved.

Reason: To enable the Local Planning Authority to exercise control over the said matters which are not particularised in the application for planning permission in accordance with Section 92 of the Town and Country Planning Act 1990 and Town and Country Planning (General Development Procedure) Order 1995.
2) Application for approval of the reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission.

Reason: To comply with the provisions of Section 92 (2) (a) and (4) of the Town and Country Planning Act 1990.
3) The development hereby permitted shall be begun either before the expiration of three years from the date of this permission, or before the expiration of two years from the date of approval of the last of the reserved matters to be approved, whichever is the later.

Reason: To comply with the provisions of Sections 92 (2) (b) and (4) of the Town and Country Planning Act 1990.
4) No dwelling shall be occupied until a 1.8m wide footway has been constructed on the north side of the road between the existing access and Flitton Hill in accordance with details of the approved drawing or scheme submitted to and approved by the Local Planning Authority. Any Statutory Undertakers equipment or street furniture shall be resited to provide an unobstructed footway.

Reason: In the interests of road safety and pedestrian movement.
5) Before the new access is brought into use the whole length of the existing ditch on the north side of the road shall be piped in accordance with details of the approved drawing/scheme to be submitted to and approved by the Internal Drainage Board and the Local Planning Authority.

Reason: In the interests of road safety.
6) Before the access is first brought into use a triangular vision splay shall be provided on each side of the new access and shall measure 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site and 1.8m measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.

Reason: To provide adequate visibility between the existing highway and the proposed access and to make the access safe and convenient for traffic, likely to use it.
7) The proposed vehicular access shall be surfaced in bituminous or other similar durable material as may be approved in writing by the Local Planning Authority for a distance of 3m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety.
8) Visibility splays shall be provided at the junction of the access with the public highway before the development is brought into use. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the proposed access from its junction with the channel of the public highway and 70m measured from the centre line of the proposed access along the line of the channel of the public highway. The required vision splays shall, on land in the applicant's control, be kept free of any obstruction exceeding a height of 1.05m

Reason: To provide adequate visibility between the existing highway and the proposed access and to make the access safe and convenient for traffic, likely to use it.
9) Before the new access is first brought into use, any existing access within the frontage of the land to be developed, not incorporated in the access hereby approved shall be closed in a manner to the Local Planning Authority's written approval.

Reason: In the interest of road safety and to reduce the number of points at which traffic will enter and leave the public highway.
10) Before the premises are occupied all on site vehicular areas shall be surfaced in a manner to the Local Planning Authoritys approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and of the premises.
11) The turning space for vehicles illustrated on the approved plan (No 3728-PL-011A) shall be constructed before the development is first brought into use.

Reason: To enable vehicles to draw off, park and turn outside the highway limits thereby avoiding the reversing of vehicles on to the highway.
12) The proposed development shall be carried out and completed in all respects in accordance with the access, siting and layout illustrated on the approved plan No. 3728-PL-011A and defined by this permission and, notwithstanding the provision of the Town and Country Planning General Permitted Development Order 1995, (or any Order revoking or re-enacting that Order) there shall be no variation without the prior approval in writing of the Local Planning Authority.

Reason: To ensure that the development of the site is completed insofar as its various parts are interrelated and dependent one upon another and to provide adequate and appropriate access arrangements at all times.
13) No development shall commence until a wheel cleaning facility has been provided at all site exits in accordance with a scheme to be submitted to and approved in writing by the Local Planning Authority. The wheel cleaner(s) shall be removed from the site once the roadworks necessary to provide adequate access from the public highway have been completed (apart from final surfacing) to the satisfaction of the Local Planning Authority.

Reason: In the interests of the amenity and to prevent the deposit of mud or other extraneous material on the highway during the construction period.
14) All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the buildings or the completion of the development whichever is the sooner; and any trees or plants which within a period of 5 years of completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species unless the Local Planning Authority give written consent to any variation.

Reason: In the interests of the visual amenities of the site and the area generally.
15) No development shall take place until there has been submitted to and approved in writing by the Local Planning Authority a plan indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed before the buildings are occupied. Development shall be carried out in accordance with the approved details.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.