<< Back to case
Conditions or Reasons for Planning Application - MB/05/01779/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within three years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match/complement the existing building(s) and the visual amenities of the locality.
3) Development shall not begin until a scheme for the investigation and assessment to identify the extent and nature of any contamination of the site has been carried out and the results provided to the Local Planning Authority, together with written details of the measures to be taken to remediate any contamination revealed, for written approval. Development shall not commence until the remediation measures thereby approved have been completed.

Reason: To ensure that any contamination which exists on the site is identified and properly dealt with in the interests of the amenities of the future occupiers of the site and of the surrounding area.
4) Details of the method of disposal of foul and surface water drainage shall be submitted to and agreed in writing by the Local Planning Authority including any land drainage system, before the development is commenced. Thereafter no part of the development shall be brought into use until the approved drainage scheme has been implemented.

Reason: To ensure that adequate foul and surface water drainage is provided and that existing and future land drainage needs are protected.
5) Prior to the commencement of any development a scheme for the provision and implementation of pollution control, which shall include foul and surface water drainage, shall be submitted and agreed in writing with the Local Planning Authority. The works shall be constructed and complied with in accordance with the approved plans.

Reason: To ensure a satisfactory method of pollution control.


Return to Search | Close WindowTop of Page