<< Back to case
Conditions or Reasons for Planning Application - MB/06/00296/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within three years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) Details of the materials to be used for the external walls and roof shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby permitted.

Reason: To protect the visual amenities of the building and of the area generally.
3) No development shall take place until full details of both hard and soft landscape works have been submitted to and approved in writing by the Local Planning Authority and these works shall be carried out as approved. These details shall include:-

proposed finished levels or contours;
materials to be used for any hard surfacing;
proposed and existing functional services above and below ground level;
planting plans, including schedule of size, species, positions, density and times of planting;
cultivation details including operations required to establish new planting;
details of existing trees and hedgerows on the site, indicating those to be retained and the method of their protection during development works.

Reason: In order to ensure that the landscaping is carried out within a reasonable period in the interest of the visual amenities of the area.
4) All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the buildings or the completion of the development whichever is the sooner; and any trees or plants which within a period of 5 years of completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species unless the Local Planning Authority give written consent to any variation.

Reason: In the interests of the visual amenities of the site and the area generally.
5) No development shall take place until there has been submitted to and
approved in writing by the Local Planning Authority a plan indicating the
positions, design, materials and type of boundary treatment to be erected.
The boundary treatment shall be completed before the building(s) is/are occupied. Development shall be carried out in accordance with the approved details.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
6) Notwithstanding any provision of the Town and Country Planning (General Permitted Development Order) 1995 (or any Order revoking or re-enacting that Order with or without modification) no works shall be commenced for the extension or alteration of the building until detailed plans and elevations have been submitted to and approved in writing by the Local Planning Authority.

Reason: To safegaurd the visual amenity within this Green belt location and to protect the amenities of occupiers of neighbouring properties.
7) The first floor window(s) in the side elevation of the development hereby permitted shall be fitted with obscured glass of a type to substantially restrict vision through them at all times, details of which shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development. No further windows or other openings shall be formed in the side elevations.

Reason: To safeguard the amenities of occupiers of adjoining properties.


Return to Search | Close WindowTop of Page