<< Back to case
Conditions or Reasons for Planning Application - MB/06/01052/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within three years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match/complement the existing building(s) and the visual amenities of the locality.
3) No development shall take place until there has been submitted to and approved in writing by the Local Planning Authority a plan indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed before the building(s) is/are occupied. Development shall be carried out in accordance with the approved details.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
4) No development shall take place until full details of both hard and soft landscape works have been submitted to and approved in writing by the Local Planning Authority and these works shall be carried out as approved. These details shall include:-

i) materials to be used for any hard surfacing;
ii) planting plans, including schedule of size, species, positions, density and times of planting;
iii) cultivation details including operations required to establish new planting;
iv) details of existing trees and hedgerows on the site, indicating those to be retained and the method of their protection during development works.

Reason: In order to ensure that the landscaping is carried out within a reasonable period in the interest of the visual amenities of the area.
5) The planting which shall have been approved consequent upon the submission of the scheme in accordance with Condition 4 above shall be carried out by a date which shall be not later than the end of the full planting season immediately following the completion of the development. Thereafter the planting shall be adequately maintained for a period of five years from the date of planting. Any of the trees or shrubs or both which die or are removed, or which become severely damaged or seriously diseased (during the said period of five years) shall be replaced with trees or shrubs or both, as the case may be, of similar size and species to those originally required to be planted and the same shall be maintained until properly established.

Reason: In order to ensure that the planting is carried out within a reasonable period in the interest of the visual amenities of the area.


Return to Search | Close WindowTop of Page