<< Back to case
Conditions or Reasons for Planning Application - MB/08/00090/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within three years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) A scheme shall be submitted for written approval by the Local Planning Authority setting out the details of the materials to be used for the external walls and roof. The development shall be carried out in accordance with the approved scheme.

Reason: To protect the visual amenities of the building and of the area generally.
3) Prior to the commencement of development a scheme setting out measures for protecting all tree, shrubs and other natural features during construction work shall be submitted to and approved in writing by the Local Planning Authority. No work shall commence on site until all trees, shrubs and features to be protected are fenced with 2.3 high weldmesh fencing securely mounted on standard scaffolding poles driven firmly in the ground in accordance with
BS 5837:2005;
for trees and shrubs the fencing shall follow a line 1.0m outside the furthest extent of the crown spread, unless otherwise agreed in writing by the Local Planning Authority;
for upright growing trees at a radius from the trunk not less than 6.0m, or two thirds of the height of the tree whichever is the greater;
for other natural features along a line to be approved in writing by the Local Planning Authority.
Such fencing shall be maintained during the course of the works on the site. No unauthorised access or placement of goods, fuels or chemicals, soil or other materials shall take place inside the fenced area.

Reason: To safeguard the existing trees on the site in the interests of visual amenity.
4) Full details of both hard and soft landscaping shall be submitted to and approved in writing by the Local Planning Authority. These details shall include:-

proposed finished levels or contours;
materials to be used for any hard surfacing;
proposed and existing functional services above and below ground level;
planting plans, including schedule of size, species, positions, density and times of planting;
cultivation details including operations required to establish new planting;
details of existing trees and hedgerows on the site, indicating those to be retained and the method of their protection during development works.

The development shall be carried out in accordance with the approved details.

Reason: In order to ensure that the landscaping is carried out within a reasonable period in the interest of the visual amenities of the area.
5) All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the buildings or the completion of the development whichever is the sooner; and any trees or plants which within a period of 5 years of completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species unless the Local Planning Authority give written consent to any variation.

Reason: In the interests of the visual amenities of the site and the area generally.
6) Notwithstanding any provision of the Town and Country Planning (General Permitted Development Order) 1995 (or any Order revoking or re-enacting that Order with or without modification) no works for any extension shall be commenced until detailed plans and elevations have been submitted to and approved in writing by the Local Planning Authority.

Reason: To protect the amenities of occupiers of neighbouring properties.