Conditions or Reasons for Planning Application - MB/08/00097/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within three years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) Before the access is first brought into use a triangular vision splay shall be provided on the west side of the new access and shall measure 1.2m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m measured into the site at right angles to the same line along the side of the boundary of no. 81 High Street. The vision splays so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.

Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it.
3) Before the access is first brought into use a triangular vision splay shall be provided on the east side of the new access and shall measure 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.

Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it.
4) The permission shall extend only to the application as amended by MBDC/2a (received 19.2.08).

Reason: For the avoidance of doubt and to ensure that the development is implemented in accordance with the plans formally approved by the Local Planning Authority.