| Conditions or Reasons: | 1)
The works hereby consented shall be begun within three years of the date of this permission.
Reason: To comply with Section 18 of the Planning (Listed Buildings and Conservation Areas) Act 1990, to ensure that this consent does not continue in existence indefinitely if the development to which it relates is not carried out. |
2)
Prior to commencement of development, detailed drawings of all proposed new and / or replacement doors & windows, together with a detailed specification of the materials, construction & finishes, shall be submitted to & approved in writing by the Local Planning Authority. Details shall be provided which clearly show (as appropriate)- a section of the glazing bars, frame mouldings, door panels, the position of the door or window frame in relation to the face of the wall, depth of reveal, arch & sill detail. The development shall accord with the plan approved.
Reason: To ensure that the special architectural or historic interest of the building or structure, its character & appearance is properly preserved, maintained & enhanced, in accordance with PPG15 & standard conservation good practice. |
3)
Prior to any brickwork repair or new brickwork being first commenced, a detailed description & precise specification of the nature, bond & extent of the works, together with the lime-based mortar mix & sand/ aggregate to be used, shall be submitted to & approved in writing by the Local Planning Authority. Additionally, a sample panel or area of the brickwork, in the agreed bond & providing a representative range of the bricks to be used throughout the repairs, in terms of colour, texture & the mortar jointing or pointing profile or finish, shall be provided as a reference & agreed standard to maintain consistency in workmanship, & shall be retained for the duration of the repair works.
Reason: To ensure that the special architectural or historic interest of the building or structure, its character & appearance is properly preserved, maintained & enhanced, in accordance with PPG15 & standard conservation good practice. |
4)
Following the carrying out or completion of the building operations or alterations for which consent is hereby granted, all making good of the existing building shall be carried out in materials & finishes which closely match, like-for-like, those historic materials & finishing details used in the existing building or structure- to accord with usual conservation good practice & to the satisfaction of the Local Planning Authority. If there is any doubt regarding the approach to any proposed making good, or any alternative materials are proposed, a precise specification of the materials & finishes should be submitted to & agreed in writing by the Local Planning Authority.
Reason: To ensure that the special architectural & historic interest, character & appearance of the building is properly maintained, in accordance with PPG15 & standard conservation good practice. |
|
|---|