Conditions or Reasons for Planning Application - CB/09/06701/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within three years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) Before development is undertaken on site, a scheme shall be submitted, and approved by, the Local Planning Authority setting out the details of the materials to be used for the external walls and roof. The development shall be carried out in accordance with the approved scheme.

Reason: To protect the visual amenities of the building and of the area generally.
3) Notwithstanding the details shown on the approved plans, development shall not be undertaken on site until details of the proposed vehicular access with the highway have been approved by the Local Planning Authority and no building shall be occupied until the junction has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
4) Before development is undertaken on site, details of 3 no. parking spaces measuring a minimum of 2.4m x 4.8m each shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be brought into use until the bays have been constructed in accordance with the approved details.

Reason: To provide adequate on-site car parking and for the avoidance of doubt.
5) Before the access is first brought into use a triangular vision splay shall be provided on each side of the new access and shall measure 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicants control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.

Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it (them).
6) Visibility splays shall be provided at the junction of the vehicular access with the public highway. The splays shall extend to the limits of the site's highway frontage on each side of the access from a point on the centre line of the access measured 2.4m back from the road channel. The vision splays shall be maintained free of any obstruction to visibility.

Reason: To provide adequate visibility between the existing highway and the proposed access, and to make access safe and convenient for the traffic which is likely to use it.
7) Before the premises are occupied, the on-site vehicular areas shall be constructed and surfaced in a stable and durable manner in accordance with details to be approved in writing by the Local Planning Authority. Arrangements shall be made for surface water discharge from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits.
8) Any gates provided shall open away from the highway and be set back a distance of at least 5.0m from the nearside edge of the carriageway of the adjoining highway.

Reason: To enable vehicles to draw off the highway before the gates are opened.
9) Before the new access is first brought into use, any existing access within the frontage of the land to be developed, not incorporated in the access hereby approved shall be closed in a manner to the Local Planning Authority's written approval.

Reason: In the interest of road safety and to reduce the number of points at which traffic will enter and leave the public highway.