<< Back to case
Conditions or Reasons for Planning Application - CB/10/00378/FULL
Conditions or Reasons:
1) The development shall begin not later than three years from the date of this permission.
REASON: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) Before development begins and notwithstanding the details submitted with the application, details of the materials to be used for the external walls and roofs of the proposed building/s shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
REASON: To control the appearance of the building/s.
(Policy BE8, S.B.L.P.R).
3) The planting and landscaping scheme shown on approved Drawing No. 0920/1 Rev.D shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season shall mean the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season and maintained until satisfactorily established.
REASON: To ensure a satisfactory standard of landscaping.
(Policy BE8, S.B.L.P.R).
4) Before the development is first occupied the screen fencing shown on Drawing No. 0920/1 Rev.D and thereafter retained.
REASON: To safeguard the amenity of the area.
(Policy BE8, S.B.L.P.R).
5) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building/s hereby permitted shall be carried out without the grant of further specific permission from the Local Planning Authority.
REASON: To control the external appearance of the building/s in the interests of the amenities of the area.
(Policy BE8, S.B.L.P.R).
6) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order amending or revoking and re-enacting that Order with or without modification), no additional windows or rooflights shall be inserted into the rear (north) facing roofslope of the dwelling.
REASON: To protect the amenity of neighbouring residents.
(Policy H2, S.B.L.P.R).
7) Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 1995, or any amendments thereto, the garage accommodation on the site shall not be used for any purpose, other than as garage accommodation, unless permission has been granted by the Local Planning Authority on an application made for that purpose.
REASON: To retain off-street parking provision and thereby minimise the potential for on-street parking which could adversely affect the convenience of road users.
(Policy T10, S.B.L.P.R).
8) Before the accesses are first brought into use a triangular vision splay shall be provided on each side of the new accesses and shall measure 1.8 metres along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8 metres measured into the site at right angles to the same line along the side of the new access driveS. The vision splays so described and on land under the applicants control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.
REASON: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them.
9) Visibility splays shall be provided at the junction of the accesses with the public highway before the development is brought into use. The minimum dimensions to provide the required splay lines shall be 2.4 metres measured along the centre line of the accesses from their junction with the channel of the public highway and 25 metres measured from the centre line of that access along the line of the channel of the public highway. The required vision splays shall, on land in the applicants' control, be kept free of any obstruction.
REASON: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them.
10) Any gates provided shall open away from the highway and be set back a distance of at least 5.0 metres from the nearside edge of the carriageway of the adjoining highway.
REASON: To enable vehicles to draw off the highway before the gates are opened.
11) The driveway length in front of the garages shall be at least 6.0 metres as measured from the garage doors to the highway boundary.
REASON: To ensure that parked vehicles do not adversely affect the safety and convenience of road users by overhanging the adjoining public highway.
12) This permission relates only to the details shown on the Site Location Plan and Drawing No.'s 0920/1 Rev.D & 0920/2 Rev.C received 29/01/10 or to any subsequent appropriately endorsed revised plan.
REASON: To identify the approved plans and to avoid doubt.


Return to Search | Close WindowTop of Page