Conditions or Reasons for Planning Application - CB/10/02708/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within three years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) No development shall take place until the applicant or developer has secured the implementation of a Written Scheme of Archaeological Investigation which has been submitted to and approved by the Local Planning Authority. The said development shall only be implemented in accordance with the scheme thereby approved.

Reason: To safeguard any material of archaeological interest which exists on the site and in line with Policy 12 HE12.3 of PPS 5 Planning for the Historic Environment.
3) Details/samples of materials to be used for all external finishes including brick bond and mortar mix of the development hereby approved shall be submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance therewith.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match/complement the existing building(s) and the visual amenities of the locality.
4) Full details of the hedge to the side boundary of the front garden shall be submitted to and approved in writing by the Local Planning Authority. These details shall include:-

planting plans, including schedule of size, species, positions, density and times of planting;
cultivation details including operations required to establish new planting;

The development shall be carried out in accordance with the approved details.

Reason: In order to ensure that the landscaping is carried out within a reasonable period in the interest of the visual amenities of the area.
5) The scheme approved in Condition 4 shall be carried out by a date which shall be not later than the end of the full planting season immediately following the completion of the development, unless an alternative period has been agreed in writing by the Local Planning Authority.

Thereafter the planting shall be adequately maintained for a period of five years from the date of planting. Any of the trees or shrubs or both which die or are removed, or which become severely damaged or seriously diseased (during the said period of five years) shall be replaced with trees or shrubs or both, as the case may be, of similar size and species to those originally required to be planted and the same shall be maintained until properly established.

Reason: In order to ensure that the planting is carried out within a reasonable period in the interest of the visual amenities of the conservation area.
6) Notwithstanding any provision of the Town and Country Planning (General Permitted Development) Order 1995 (or any Order revoking or re-enacting that Order with or without modification) no further window or other opening shall be formed on either side elevation or the roofslope of the development hereby granted without the specific grant of planning permission.

Reason: To protect the visual amenities of the conservation area.
7) The extension shall not be occupied until the junction of the proposed vehicular access with the highway has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
8) A visibility splay shall be provided at the junction of the access with the public highway before the development is brought into use. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the proposed access from its junction with the channel of the public highway and 10.0m measured from the centre line of the proposed access along the line of the channel of the public highway to the north-west. The required vision splay shall, on land in the applicant's control, be kept free of any obstruction.

Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it.
9) Before the development is brought into use the first 2.4m of the eastern site boundary measured from the channel of the public highway shall, on land in the applicants control, be kept free of any obstruction.

Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it.
10) Before the development is brought into use the on site vehicular areas shall be constructed and surfaced in a stable and durable manner in accordance with details to be approved in writing by the Local Planning Authority for a distance of 5.0m into the site, measured from the highway boundary. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits.
11) Before the new access is first brought into use, the highway land at the eastern side of the site and hatched blue on the appended drawing no. 1 and not incorporated in the access hereby approved shall be re-instated in a manner to the Local Planning Authority's written approval.

Reason: In the interest of road safety and to reduce the number of points at which traffic will enter and leave the public highway.