Conditions or Reasons for Planning Application - SB/07/01174
Conditions or Reasons:
1) The development shall begin not later than three years from the date of this permission.
REASON: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) Before development commences, an investigation and risk assessment of the site shall be carried out to identify possible contamination to ground, soil and sensitive receptors to determine measures necessary to remove, neutralise, and isolate such contamination. Any assessments should use the appropriate, authoritative and scientifically based guideline values. Details of such investigation, assessment and the measures proposed shall be submitted to and approved in writing by the District Planning Authority and the development shall thence proceed only in accordance with the measures as approved.
Where remediation measures are necessary a Remediation Strategy shall be provided giving full details of the remediation measures required and how they are to be undertaken. On completion of those works a verification report shall be provided confirming the remediation measures that have been undertaken in accordance with the Remediation Strategy and setting out measures for further monitoring and reporting as necessary.
If, during development, contamination not previously identified is found to be present at the site, then no further development (unless otherwise agreed in writing with the District Planning Authority) shall be carried out until the developer has submitted a Remediation Strategy or obtained written approval from the District Planning Authority for an addendum to an existing Remediation Strategy, the addendum of which must detail how this unsuspected contamination shall be dealt with and from the date of approval of the addendum(s) shall form part of the Remediation Strategy.
REASON: To ensure that any site contamination is dealt with safely in the interests of the health and safety of the public and users of the development hereby permitted.
(Policy BE8, S.B.L.P.R).
3) Before development begins, a landscaping scheme to include any hard surfaces and earth mounding shall be submitted to and approved in writing by the District Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season and maintained until satisfactorily established.
REASON: To ensure a satisfactory standard of landscaping.
(Policy BE8, S.B.L.P.R).
4) Before the development is first occupied or brought into use, the parking scheme shown on Drawing No. 1107-L3 Rev.B shall be completed and thereafter retained for this purpose.
REASON: To ensure provision for car parking clear of the highway.
(Policy T10, S.B.L.P.R).
5) Before development begins, a scheme for screen fencing and/or screen walling shall be submitted to and approved in writing by the District Planning Authority. The approved scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained.
REASON: To safeguard the amenity of the area.
(Policy BE8, S.B.L.P.R).
6) Before development begins, details of the levels of the proposed dwelling shall be submitted to and approved in writing by the District Planning Authority, and development shall thereafter be implemented accordingly.
REASON: To produce a satisfactory relationship between the various elements of the scheme and adjacent properties.
(Policy BE8, S.B.L.P.R).
7) Before development begins, samples of the materials to be used for the external walls and roofs of all new buildings shall be submitted to and approved in writing by the District Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
REASON: To control the appearance of the building/s.
(Policy BE8, S.B.L.P.R).
8) Before the access is first brought into use a triangular vision splay shall be provided on each side of the new access and shall measure 1.8 metres along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8 metres measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.
REASON: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them.
9) Before the premises are occupied all on site vehicular areas shall be surfaced in bituminous or other similar durable material as may be approved in writing by the District Planning Authority. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
REASON: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety.
10) Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 1995, gates shall not be erected between the parking bays for the existing dwelling and the highway, unless permission has been granted by the District Planning Authority on an application made for that purpose.
REASON: So that gates do not obstruct the footway when open.
11) The maximum gradient of the vehicular access shall be 10% (1 in 10).
REASON: In the interests of the safety of persons using the access and users of the highway.
12) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building/s hereby permitted shall be carried out without the grant of further specific permission from the District Planning Authority.
REASON: To control the external appearance of the building/s in the interests of the amenities of the area.
(Policy BE8, S.B.L.P.R).
13) This permission relates only to the details shown on Drawing No. 1107-L3 Rev. B received 23/10/07 and Drawings Nos. 1107-1B1 Rev. A & 1107-1B3 Rev. A received 27/11/07 or to any subsequent appropriately endorsed revised plan.
REASON: To identify the approved drawings and to avoid doubt.