Conditions or Reasons for Planning Application - CB/13/00798/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within three years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match/complement the existing building(s) and the visual amenities of the locality.
3) Development shall not commence until a scheme detailing provision for on site parking for construction workers for the duration of the construction period has been submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented throughout the construction period.

Reason: To ensure adequate off street parking during construction in the interests of road safety.
4) Before the extension hereby approved are brought into use all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason : In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises.
5) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 28213, 20311.

Reason: For the avoidance of doubt.