| Conditions or Reasons: | 1)
The development shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Development shall not commence until details of the materials to be used for the external windows, doors, walls, roofs and rainwater goods of the proposed buildings have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out only in accordance with the approved details. Reason: To ensure that the development is in keeping with the character of the surrounding Conservation Area. |
2)
Development shall not commence until details of the materials to be used for the external windows, doors, walls, roofs and rainwater goods of the proposed buildings have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out only in accordance with the approved details. Reason: To ensure that the development is in keeping with the character of the surrounding Conservation Area. |
3)
No development shall commence until detailed drawings of all proposed new doors & windows to a scale of 1:20, together with a detailed specification of the materials, construction & finishes, have been submitted to & approved in writing by the Local Planning Authority.
Reason: To ensure that the new development is sympathetic to the character & appearance of historic buildings within the Conservation Area and the setting of listed buildings. |
4)
No development shall commence until details of surface water drainage for the site have been submitted to and approved in writing by the Local Planning Authority. The drainage works shall be constructed in accordance with the approved plans before any part of the development is brought into use.
Reason: To ensure that adequate surface water drainage is provided to prevent water pollution and flooding. |
5)
No development shall commence until all preliminary works, ground protection and protective fencing has been implemented in strict accordance with the Method Statement and Tree Protection Plan, as shown on the drawing "Tree Removal and Protection Plan" (Drawing No. 11-734-P-15 submitted as part of planning permission CB/11/3832/FULL).
Reason:To safeguard the integrity of the rooting medium, rooting system and existing canopy spread of retained trees and hedges, in the interests of maintaining the respective Root Protection Areas, good health and natural appearance of retained trees and hedging, thereby maintaining visual amenity and effective boundary screening. |
6)
Consent is being granted in recognition that no underground services are scheduled to be routed through the Root Protection Areas of retained trees and hedging. If any services are subsequently required to be routed through those areas protected under the Tree Protection Plan, then this work shall be carried out in full accordance with the National Joint Utilities Group (NJUG) Volume 4 "Guidelines for the Planning, Installation and Maintenance of Utility Apparatus in Proximity to Trees"
Reason:To safeguard the integrity of the rooting medium and root system of trees and hedges in the interests of maintaining tree health, visual amenity and effective boundary screening. |
7)
No development shall commence until a landscaping scheme has been submitted to and approved in writing by the Local Planning, showing the species, sizes, position and planting specification of new trees, shrubs, climbers and hedging, to be planted during the planting season following completion of development. During each subsequent August for the first five years following initial planting, any losses of plants shall be checked and recorded and losses shall be replaced using the same species, planting size and planting specification in the following growing season (a growing season shall be deemed to be between 1st November to 31st March).
Reason: To ensure a satisfactory establishment of landscape planting in order to enhance visual amenity and to integrate the development into the urban landscape. |
8)
No development shall commence until details of the junctions between the proposed access roads and the highway have been approved by the Local Planning Authority and no dwelling shall be occupied until the junction which provides a means of access to it has been constructed in accordance with the approved details.
Reason:In order to minimise danger, obstruction and inconvenience to users of the highway and of the proposed access road. |
9)
No dwelling shall be occupied until visibility splays have been provided at the junctions of the access roads with the public highway. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the proposed access road from its junction with the channel of the public highway and 38m measured from the centre line of the proposed access road along the line of the channel of the public highway. The vision splays required shall be provided and defined on the site by or on behalf of the developers and be kept free of any obstruction.
Reason:To provide adequate visibility between the existing highway and the proposed accesses and to make the accesses safe and convenient for the traffic that is likely to use it them. |
10)
No development shall commence until detailed plans and sections of the proposed roads, including gradients and method of surface water disposal have been submitted to and approved in writing by the Local Planning Authority and no building shall be occupied until the section of road which provides access has been constructed apart from final surfacing in accordance with the approved details.
Reason:To ensure that the proposed roadworks are constructed to an adequate standard. |
11)
No development shall commence until details of a scheme showing the relocated position of the street furniture and electricity pole has been submitted to and approved in writing by the Local Planning Authority. No part of the development shall be occupied until the street furniture and electricity pole have been relocated in accordance with the approved details.
Reason:In the interests of road safety and pedestrian movement. |
12)
Before any dwelling is occupied all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
Reason:In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises. |
13)
Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 1995, or any amendments thereto, the garage accommodation on the site shall not be used for any purpose, other than as garage accommodation, unless permission has been granted by the Local Planning Authority on an application made for that purpose.
Reason:To retain off-street parking provision and thereby minimise the potential for on-street parking which could adversely affect the convenience of road users. |
14)
The turning spaces for vehicles illustrated on the Drawing No 11-734-P-01 Rev F submitted with approval CB/11/3832/FULL) shall be constructed before the development is first brought into use.
Reason:To enable vehicles to draw off, park and turn outside the highway limits thereby avoiding the reversing of vehicles on to the highway. |
15)
No development shall commence until a scheme detailing access provision to and from the site for construction traffic, which details shall show what arrangements will be made for restricting such vehicles to approved points of access and egress has been submitted to and approved in writing by the Local Planning Authority. The scheme shall be operated throughout the period of construction work.
Reason:To ensure the safe operation of the surrounding road network in the interests of road safety. |
16)
No development shall commence until a scheme detailing provision for on-site parking for construction workers for the duration of the construction period has been submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented throughout the construction period.
Reason:To ensure adequate off street parking during construction in the interests of road safety. |
17)
No development shall commence until details of the final ground and slab levels of the dwellings hereby approved are submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.
Reason: To ensure that a satisfactory relationship results between the new development and adjacent buildings and public areas. |
18)
Notwithstanding any provision of the Town and Country Planning (General Permitted Development Order) 1995 (or any Order revoking or re-enacting that Order with or without modification) no works shall be commenced for the extension of the building hereby approved nor any material alteration of their external appearance until detailed plans and elevations have been submitted to and approved in writing by the Local Planning Authority.
Reason: To protect the amenities of occupiers of neighbouring properties. |
19)
No development shall commence until details of all boundary walls and fencing have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained.
Reason: To safeguard the amenity of the area and ensure privacy between dwellings. |
20)
Tree felling and scrub clearance of the site should avoid the bird nesting season between March and August inclusive and consideration should be given during site clearance to the presence of hedgehogs.
Reason: To ensure the protection of wildlife interests within the site. |
21)
The first floor west elevation windows of plot 5 and the first floor east and west elevation windows of plot 3 shall be fitted with obscured glass of a type to substantially restrict vision at all times, and thereafter retained as such. No first floor windows or other openings shall be formed in those elevations or in the first floor north elevation of plot 4 unless approved in writing by the Local Planning Authority.
Reason: To safeguard the amenities of occupiers of existing and future properties. |
22)
No development shall take place until a written scheme of archaeological investigation has been submitted to and approved in writing by the Local Planning Authority. The said development shall only be implemented in full accordance with the approved archaeological scheme." Reason: To record and advance understanding of the archaeological resource which will be unavoidably destroyed as a consequence of the development. This is in line with policy 46 of the Draft Development Strategy for Central Bedfordshire. |
23)
No development shall commence until a scheme for the parking of cycles on the site shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose.
Reason: To ensure the provision of adequate cycle parking to meet the needs of occupiers of the proposed development in the interests of encouraging the use of sustainable modes of transport. |
24)
Details of bin storage/collection point shall be submitted to and approved by the Local Planning Authority and implemented prior to the occupation of any dwelling.
Reason: In the interest of amenity. |
25)
The development hereby permitted shall not be carried out except in complete accordance with the plans previously approved as part of planning application CB/11/3832/FULL as varied by the submitted plan numbers 13-795-P01A, P02B, P03B.
Reason: For the avoidance of doubt. |
|
|---|