<< Back to case
Conditions or Reasons for Planning Application - CB/13/02542/FULL
Conditions or Reasons:
1) Within one month of the date of this permission, details of the external lighting of the site including locations, design, heights and level of luminance are to be submitted in writing to the Local Planning Authority. If lighting is installed on site it shall be in accordance with the approved details and retained for the duration of the development.

Reason: To protect the amenity of neighbouring properties and the rural character of the local area, in accordance with policy DM3 of the Core Strategy and Development Management Policy (2009).
2) Within one month of the date of this permission, details of surfacing materials and
surface water drainage for the site, shall be submitted to the Local Planning
Authority. Within two months of the details being approved, the approved surfacing
materials and drainage works shall be constructed and implemented on site and
thereafter retained for the duration of the development.
Reason: To avoid the carriage of mud or other extraneous material or surface water
from the site so as to safeguard the interest of highway safety and reduce the risk of
flooding and to minimise inconvenience to users of the premises.
3) Within two months of the date of this permission, and notwithstanding the details shown on the approved plans, details of the modified junction of the vehicular access with the highway shall be submitted to and approved in writing by the Local Planning Authority. The approved modified junction shall then be constructed on site within two months of the details being approved.

Reason:
In order to minimise danger, obstruction and inconvenience to users of the highway and the premises and to mitigate oversail from delivery vehicles to the site, in accordance with policy DM3 of the Core Strategy and Development Management Policies (2009).
4) Within one month of the date of this permission, details of visibility splays to be provided at the junction of the access with the public highway shall be submitted to the Local Planning Authority. The minimum dimensions of the required vision splay lines shall be 2.4m measured along the centre line of the proposed access from its junction with the channel of the public highway and 120.0m measured from the centre line of the proposed access along the line of the channel of the public highway. The approved vision splays shall be implemented on site within one month of the approval of the details and remain free of any obstruction for the duration of the development.

Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it, in accordance with policy DM3 of the Core Strategy and Development Management Policies (2009).
5) No deliveries of cars shall be taken at or dispatched from the site outside the hours of 08.00 and 18.00 on Mondays to Saturdays, and not at all on Sundays and Bank Holidays.

Reason: To safeguard the amenities of neighbouring properties, in accordance with policy DM3 of the Core Strategy and Development Management Policies (2009).
6) The landscaping scheme shown on plan 10536:02E shall be carried out no later than the end of the full planting season immediately following the date of this decision.

Thereafter the planting shall be adequately maintained for a period of five years from the date of planting. Any of the trees or shrubs or both which die or are removed, or which become severely damaged or seriously diseased (during the said period of five years) shall be replaced with trees or shrubs or both, as the case may be, of similar size and species to those originally required to be planted and the same shall be maintained until properly established.

Reason: In order to ensure that the planting is carried out within a reasonable period in the interest of the visual amenities of the area, in accordance with policy DM3 of the Core Strategy and Development Management Policies (2009).
7) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 10536:02E, 10536:03B and TSP/MRS/01.

Reason: For the avoidance of doubt.
8) The kerb build out adjacent to parking bay 1, and the area between the rear of
bays 1 and 2 and the highway way boundary, shall be maintained free of any
obstruction to visibility exceeding a height of 600mm above the adjoining carriage
way level.
Reason: To provide driver/ driver intervisibility between vehicles using the bays and
the access and for the avoidance of doubt, in accordance with policy DM3 of the
Core Strategy and Development Management Policies (2009).
9) Within 1 month of the date of this permission, details of a light goods vehicle
parking space for the loading/unloading for the restaurant/letting rooms and fast food
takeaway and keep clear signage for this bay, shall be submitted to and approved in
writing by the Local Planning Authority, and within one month of that approval, the
loading/unloading space shall be located and constructed in accordance with the
approved details and the signage installed.
Reason: To provide an adequate loading/unloading bay for the existing
restaurant/letting rooms/fast food takeaway, in accordance with policy DM3 of the
Core Strategy and Development Management Policies (2009).