Conditions or Reasons for Planning Application - CB/13/03883/FULL
Conditions or Reasons:
1) The development hereby approved shall be commenced within three years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match/complement the existing building(s) and the visual amenities of the locality.
3) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, number 01

Reason: For the avoidance of doubt.
4) Development shall not begin until details of the junction of the widened vehicular access with the highway have been approved by the Local Planning Authority and the rooms within the extended dwelling shall not be brought into use until the junction has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
5) Before the extended premises are first occupied all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as to ensure satisfactory parking of vehicles outside of the highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and of the premises.