Conditions or Reasons for Planning Application - CB/14/00914/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) No development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Policies BE8 S.B.L.P.R and 43, D.S.C.B)
3) No development shall take place until details of the junction of the proposed vehicular access with the highway have been submitted to and approved in writing by the Local Planning Authority. No building shall be occupied until the junction has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
(Policies T10 S.B.L.P.R and 27 & 43, D.S.C.B)
4) Before the access is first brought into use, a triangular vision splay shall be provided on each side of the new access drive and shall be 2.8m measured along the back edge of the highway from the centre line of the anticipated vehicle path to a point 2.0m measured from the back edge of the highway into the site along the centre line of the anticipated vehicle path. The vision splay so described and on land under the applicant's control shall be maintained in perpetuity free of any obstruction to visibility exceeding a height of 600mm above the adjoining foot way level.

Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it.
(Policies T10 S.B.L.P.R and 27 & 43, D.S.C.B)
5) The development hereby permitted shall not be brought into use until visibility splays have been provided at the junction of the access with the public highway. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the proposed access from its junction with the channel of the public highway and 43m measured from the centre line of the proposed access along the line of the channel of the public highway. The required vision splays shall be maintained thereafter free of any obstructions to visibility exceeding a height of 900mm above the adjoining carriageway level.

Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it.
(Policies T10 S.B.L.P.R and 27 & 43, D.S.C.B)
6) The premises shall not be occupied until details of the construction and surfacing of the on site vehicular access have been submitted to and approved in writing by the Local Planning Authority. These details shall include arrangements for surface water drainage from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure acceptable parking of vehicles outside highway limits.
(Policies T10 S.B.L.P.R and 27 & 43, D.S.C.B)
7) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, number SC-001.2.

Reason: To identify the approved plan/s and to avoid doubt.