Conditions or Reasons for Planning Application - SB/08/00298
Conditions or Reasons:
1) The development shall begin not later than three years from the date of this permission.
REASON: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) Before development begins and notwithstanding the details submitted with the application, details of the materials to be used for the external walls and roofs of the proposed building shall be submitted to and approved in writing by the District Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
REASON: To control the appearance of the building.
(Policy BE8 , S.B.L.P.R).
3) The window coloured blue on Drawing No. 2005/Draft/1.01 shall be permanently glazed with obscured glass.
REASON: To protect the privacy of the occupiers of adjoining properties.
(Policies BE8 & H8, S.B.L.P.R).
4) Before development begins, details of the levels of the dwelling shall be submitted to and approved in writing by the District Planning Authority, and development shall thereafter be implemented accordingly.
REASON: To produce a satisfactory relationship between the various elements of the scheme and adjacent properties.
(Policy BE8, S.B.L.P.R).
5) Before development begins, the position of the dwelling shall be pegged out on site and its position approved in writing by the District Planning Authority.
REASON: To enable consideration to be given to the precise layout of the development.
(Policy BE8, S.B.L.P.R).
6) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building hereby permitted shall be carried out without the grant of further specific permission from the District Planning Authority.
REASON: To control the external appearance of the building/s in the interests of the amenities of the area.
(Policy BE8, S.B.L.P.R.).
7) Before development begins, including any ground clearance or excavation, substantial protective fencing, the details of which shall first be approved in writing by the District Planning Authority, shall be erected in the positions so approved and the fencing shall be retained at full height and extent until the development is substantially completed. No materials shall be stored or deposited and no mixing of materials shall take place within the area so protected.
REASON: To protect the trees so enclosed in accordance with Section 8 of BS 5837 of 2005 or as may be subsequently amended.
(Policy BE8, S.B.L.P.R).
8) Notwithstanding the provisions of Part 1 Class E of Schedule 2 to the Town and Country (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific permission from the District Planning Authority.
REASON: To control the development in the interests of the amenities of the area.
(Policy BE8, S.B.L.P.R).
9) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no windows shall be inserted into the eastern and western elevations of the approved dwelling.
REASON: To protect the amenity of neighbouring residents.
(Policy H8, S.B.L.P.R).
10) Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no additional windows shall be inserted at first floor level into the southern elevation of the approved dwelling.
REASON: To protect the amenity of neighbouring residents.
(Policy H8, S.B.L.P.R).
11) Before the access is brought into use an area of land across the whole of the site frontage measuring at least 2m from and parallel to the nearside edge of the adjacent road carriageway shall be provided and thereafter be kept free of all obstruction to visibility in excess of 600mm in height measured from the ground level of the channel of the main carriageway.
REASON: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it .
12) The new boundary wall shown on Drawing No. 2005/PL/2.01 shall not exceed 600mm in height.
REASON: To maximise the driver / driver intervisibility splay at the frontage of the site in the interest of road safety.
13) Before development commences, an investigation and risk assessment of the site shall be carried out to identify possible contamination to ground, soil and sensitive receptors to determine measures necessary to remove, neutralise, and isolate such contamination. Any assessments should use the appropriate, authoritative and scientifically based guideline values. Details of such investigation, assessment and the measures proposed shall be submitted to and approved in writing by the District Planning Authority and the development shall thence proceed only in accordance with the measures as approved.
Where remediation measures are necessary a Remediation Strategy shall be provided giving full details of the remediation measures required and how they are to be undertaken. On completion of those works a verification report shall be provided confirming the remediation measures that have been undertaken in accordance with the Remediation Strategy and setting out measures for further monitoring and reporting as necessary.
If, during development, contamination not previously identified is found to be present at the site, then no further development (unless otherwise agreed in writing with the District Planning Authority) shall be carried out until the developer has submitted a Remediation Strategy or obtained written approval from the District Planning Authority for an addendum to an existing Remediation Strategy, the addendum of which must detail how this unsuspected contamination shall be dealt with and from the date of approval of the addendum(s) shall form part of the Remediation Strategy.
REASON: To ensure that any site contamination is dealt with safely in the interests of the health and safety of the public and users of the development hereby permitted.
(Policy BE8, S.B.L.P.R).
14) This permission relates only to the details shown on Drawings Nos. 2005/Draft/1.01 received 14/03/08 and 2005/PL/2.01 received 02/04/08 or to any subsequent appropriately endorsed revised plan.
REASON: To identify the approved plans and to avoid doubt.