| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
No development shall commence until such time as details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
3)
Prior to the first occupation of any of the dwellings hereby approved the modified junction of the proposed vehicular access with the highway shall be fully constructed in accordance with the approved details. Thereafter it shall be retained and maintained as first constructed in perpetuity.
Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
4)
Prior to the first use of the access hereby approved a triangular vision splay shall be provided on each side of the new access drive and shall be 2.8m measured along the back edge of the highway from the centre line of the anticipated vehicle path to a point 2 metres measured from the back edge of the highway into the site along the centre line of the anticipated vehicle path. The vision splay so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.
Reason: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
5)
Prior to the first occupation of the residential development hereby approved the proposed vehicular access shall be surfaced in bituminous or other similar durable material and arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
Reason: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
6)
Prior to the first use of the modified access hereby approved, any existing access within the frontage of the land to be developed (to the frontage of plot 6 and plot 7), not incorporated in the access hereby approved shall be closed in a manner to be agreed in writing with the Local Planning Authority.
Reason: In the interest of road safety and to reduce the number of points at which traffic will enter and leave the public highway (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
7)
Prior to the first occupation of the development hereby approved full details of the demarcation/signage for the two visitor parking spaces shall be submitted to and approved in writing by the local planning authority. Thereafter the agreed signage shall be implemented prior to the first occupation of the development hereby approved and shall remain as agreed thereafter.
Reason: To provide adequate visitor parking provision (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
8)
Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 1995, or any amendments thereto, the car port accommodation on the site shall not be used for any purpose, other than as car port accommodation, unless permission has been granted by the Local Planning Authority on an application made for that purpose.
Reason: To retain off-street parking provision and thereby minimise the potential for on-street parking which could adversely affect the convenience of road users (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
9)
The proposed development shall be carried out and completed in all respects in accordance with the access siting and layout, turning area, width of the public footpath and its location/layout, vehicle parking provision and bay dimensions illustrated on the approved drawing no. 825.001P Revision E and defined by this permission and, notwithstanding the provision of the Town and Country Planning General Permitted Development Order 1995, (or any Order revoking or re-enacting that Order) there shall be no variation without the prior approval in writing of the local Planning Authority.
Reason: To ensure that the development of the site is completed insofar as its various parts are interrelated and dependent one upon another and to provide adequate and appropriate access arrangements at all times (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
10)
No development shall commence until such time as full details of a refuse collection point located outside of the public highway has been submitted to and approved by the Local Planning Authority. Thereafter the agreed scheme shall be fully implemented prior to occupation of any dwellings hereby approved and shall be retained thereafter.
Reason: In the interest of amenity and in order to minimise danger, obstruction and inconvenience to users of the highway and the premises (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
11)
Prior to the first occupation of the residential units hereby approved full details of the design of the structures proposed for the secure and covered cycle storage and storage of refuse and recycling bins shall be submitted to and approved in writing by the local planning authority. Thereafter the approved storage provision shall be fully implemented prior to the first occupation of the residential units hereby approved and thereafter retained for this purpose.
Reason: To ensure the provision of adequate cycle parking and refuse/recycling storage to meet the needs of occupiers of the proposed development in the interests of encouraging the use of sustainable modes of transport and that it is in keeping and character with the surrounding area in respect to its design and appearance (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
12)
No development shall commence until such time as full details of the final ground and slab levels of the dwelling hereby approved has been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.
Reason: To ensure that a satisfactory relationship results between the new development and adjacent buildings and public areas (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
13)
No development shall commence until such time as full details of both hard and soft landscaping have been submitted to and approved in writing by the Local Planning Authority. These details shall include:-
proposed finished levels or contours; materials to be used for any hard surfacing; minor structures (e.g. furniture, play equipment); proposed and existing functional services above and below ground level; planting plans, including schedule of size, species, positions, density and times of planting; cultivation details including operations required to establish new planting;
Thereafter the development shall be carried out in accordance with the approved details. Reason: In order to ensure that the landscaping is carried out within a reasonable period in the interest of the visual amenities of the area (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
14)
All hard and soft landscape works shall be carried out in accordance with the approved details, and to a reasonable standard in accordance with the relevant recommendation of the appropriate British Standard or other recognised code of good practice. The works shall be carried out prior to the occupation of any part of the development or in accordance with the programme agreed by the local planning authority in writing. The maintenance shall be carried out in accordance with the approved schedule. Any trees or plants that are part of the approved landscaping works, within a period of five years after planting, are removed, die or become in the opinion of the local planning authority, seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of species, size and number as originally approved, unless the local planning authority gives its written consent to any variation.
Reason: To ensure provision, establishment and maintenance of a reasonable standard of landscaping in accordance with the approved design (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
15)
No development shall take place until a written scheme of archaeological investigation that adopts a staged approach and includes post excavation analysis and publication has been submitted to and approved in writing by the Local Planning Authority. Thereafter the development hereby approved shall only be implemented in full accordance with the approved archaeological scheme.
Reason: To record and advance understanding of the heritage assets with archaeological interest which will be unavoidably affected as a consequence of the development and to secure that protection and management of archaeological remains preserved in situ within the development (policy CS15 of the Core Strategy and Development Management Policies 2009). |
16)
The window openings at first and second floor level on the north facing flank wall of Plot 5 hereby approved shall be first installed with obscure glazing only, and any opening shall be at least 1.7 metres above the internal finished floor level or the windows shall be fixed shut. Thereafter these windows shall remain as first installed in perpetuity.
Reason: To protect the amenities of neighbouring occupiers (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
17)
The window opening at first floor level on the east facing flank wall of Plot 7 hereby approved shall be first installed with obscure glazing only, and any opening shall be at least 1.7 metres above the internal finished floor level or the windows shall be fixed shut. Thereafter this window shall remain as first installed in perpetuity.
Reason: To protect the amenities of neighbouring occupiers (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
18)
For the entire duration of the demolition and construction phases of the development hereby approved the length of the perimeter with Pix Brook shall be fenced to prevent and accidental loss of polluting material over the bank.
Reason: To protect the water course from pollutants (Policy DM3 of the Core Strategy and Development Management Policies 2009). |
19)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers: CBC/001; 825.001P/E; 825.002P/D; 825.103P; 825.104P; 825.105P; 825.106P/A; 825.107P; 825.108P; 825.200P; 825.201P; 825.202P/A; 825.203P/A; 825.204P/A
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|