| Conditions or Reasons: | 1)
The development shall begin not later than three years from the date of this permission. REASON: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Before development begins, a landscaping scheme to include any hard surfaces and earth mounding shall be submitted to and approved in writing by the District Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season and maintained until satisfactorily established. REASON: To ensure a satisfactory standard of landscaping. (Policy BE8, S.B.L.P.R). |
3)
Before development begins, samples of the materials to be used for the external walls and roofs of all new buildings shall be submitted to and approved in writing by the District Planning Authority. The development shall thereafter be carried out in accordance with the approved details. REASON: To control the appearance of the building/s. (Policies BE8 & H8, S.B.L.P.R). |
4)
Before development begins, a scheme for screen fencing and/or screen walling shall be submitted to and approved in writing by the District Planning Authority. The approved scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained. REASON: To safeguard the amenity of the area. (Policy BE8, S.B.L.P.R). |
5)
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building hereby permitted shall be carried out without the grant of further specific permission from the District Planning Authority. REASON: To control the external appearance of the building/s in the interests of the amenities of the area. (Policy BE8, S.B.L.P.R). |
6)
Notwithstanding the provisions of Part 1 Class E of Schedule 2 to the Town and Country (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific permission from the District Planning Authority. REASON: To control the development in the interests of the amenities of the area. (Policy BE8, S.B.L.P.R). |
7)
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no additional windows shall be inserted into the north and east facing elevations of the proposed dwelling. REASON: To protect the amenity of neighbouring residents. (Policy H8, S.B.L.P.R). |
8)
Before the access is first brought into use a triangular vision splay shall be provided on each side of the new access and shall measure 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level. REASON: To provide adequate visibility between the existing highway and the proposed access(es), and to make the access(es) safe and convenient for the traffic which is likely to use it . |
9)
Development shall not begin until details of the junction between the proposed vehicular access with the highway have been approved by the District Planning Authority and no building shall be occupied until that junction has been constructed in accordance with the approved details. REASON: In order to minimise danger, obstruction and inconvenience to users of the highway and of the proposed estate road. (Policy T10, S.B.L.P.R). |
10)
For the avoidance of doubt, the proposed vehicular access shall be surfaced in bituminous or other similar durable material as may be approved in writing by the District Planning Authority for a distance of 6m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway. REASON: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety. |
11)
Before development begins, a scheme for the parking of cycles on the site shall be submitted to and approved in writing by the District Planning Authority. The scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose. REASON: To ensure the provision of adequate cycle parking to meet the needs of occupiers of the proposed development in the interests of encouraging the use of sustainable modes of transport. |
12)
Before the development is occupied the statutory undertakers' cabinets which currently obstruct access to the site shall be relocated in accordance with details to be submitted to and approved in writing by the District Planning Authority. REASON: In order to minimise danger, obstruction and inconvenience to users of the highway and of the access. |
13)
Before any development of the site is commenced, details of the construction of the access drive shown on Drawing No. 6, shall be submitted to and approved in writing by the District Planning Authority. The constructional details shall provide for the safety of the tree roots of the nearby Maple tree, and for arrangements for the disposal of surface water from the site. The access drive shall be completed in accordance with the approved details before the dwelling is first occupied. REASON: To maintain an acceptable level of highway safety and to maintain the visual amenity of the area through the protection of the nearby Maple tree. (Policy H8, S.B.L.P.R). |
14)
Before development commences, an investigation and risk assessment of the site shall be carried out to identify possible contamination to ground, soil and sensitive receptors to determine measures necessary to remove, neutralise, and isolate such contamination. Any assessments should use the appropriate, authoritative and scientifically based guideline values. Details of such investigation, assessment and the measures proposed shall be submitted to and approved in writing by the District Planning Authority and the development shall thence proceed only in accordance with the measures as approved. Where remediation measures are necessary a Remediation Strategy shall be provided giving full details of the remediation measures required and how they are to be undertaken. On completion of those works a verification report shall be provided confirming the remediation measures that have been undertaken in accordance with the Remediation Strategy and setting out measures for further monitoring and reporting as necessary. If, during development, contamination not previously identified is found to be present at the site, then no further development (unless otherwise agreed in writing with the District Planning Authority) shall be carried out until the developer has submitted a Remediation Strategy or obtained written approval from the District Planning Authority for an addendum to an existing Remediation Strategy, the addendum of which must detail how this unsuspected contamination shall be dealt with and from the date of approval of the addendum(s) shall form part of the Remediation Strategy. REASON: To ensure that any site contamination is dealt with safely in the interests of the health and safety of the public and users of the development hereby permitted. (Policy BE8, S.B.L.P.R). |
15)
This permission relates only to the details shown on the Site Location Plan and Drawing No. 6 received 02/05/08 or to any subsequent appropriately endorsed revised plan. REASON: To identify the approved plans and to avoid doubt. |
|
|---|