| Conditions or Reasons for Planning Application - CB/15/00131/FULL |
| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
No development shall take place until details of the final ground and slab levels of the dwellings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.
Reason: To ensure that a satisfactory relationship results between the new development and adjacent buildings and public areas. |
3)
The planting and landscaping scheme shown on approved Drawing No. 15/1167/02 dated January 2015 shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season shall mean the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season with others of a similar size and species.
Reason: To ensure an acceptable standard of landscaping. (Policies 43 and 58, DSCB) |
4)
No development shall take place until details of the junction of the proposed vehicular access with the highway for the proposal have been submitted to and approved in writing by the Local Planning Authority and no building shall be occupied until the junction has been constructed in accordance with the approved details.
Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. |
5)
No development shall take place until details of the replacement junction of the proposed vehicular access with the highway for the existing dwelling (no. 6) have been submitted to and approved by the Local Planning Authority and no development shall commence for the proposal until the replacement junction has been constructed in accordance with the approved details.
Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises and to provide a replacement access for the existing dwelling. |
6)
Before any of the accesses are first brought into use, a triangular vision splay shall be provided on each side of the new access drive and shall be 2.8m measured along the back edge of the highway from the centre line of the anticipated vehicle path to a point 2.0m measured from the back edge of the highway into the site along the centre line of the anticipated vehicle path. The vision splay so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.
Reason: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them. |
7)
Visibility splays shall be provided at the junction of the accesses with the public highway before the development is brought into use. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the proposed accesses from its junction with the channel of the public highway and 43.0m measured from the centre line of the proposed access along the line of the channel of the public highway. The required vision splays shall for the duration of the development remain free of any obstruction to visibility.
Reason: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them. |
8)
No development shall take place until details of the replacement parking provision for no. 6 Cambridge Way have been submitted to and approved in writing by the Local Planning Authority, and this shall be in accordance with the Central Bedfordshire Design Guide Supplement 7.
No development shall commence for the proposal until the replacement parking provision has been constructed in accordance with the approved details. The development shall then be implemented solely in accordance with the approved details.
Reason: To provide adequate replacement parking provision clear of the highway. |
9)
Before the premises are occupied, the on site vehicular areas shall be constructed and surfaced in a stable and durable manner (not loose aggregate) in accordance with details to be approved in writing by the Local Planning Authority for a distance of 5.0m into the site, measured from the highway boundary. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits. |
10)
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building/s hereby permitted shall be carried out without the grant of further specific permission from the Local Planning Authority.
Reason: To control the external appearance of the building/s in the interests of the amenities of the area. |
11)
No development shall take place until samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Policy 43, DSCB) |
12)
Notwithstanding the details in the approved plans, the bin collection point shall not be provided in the public highway. Details of a refuse collection point located outside of the public highway shall be submitted to and approved by the Local Planning Authority prior to the occupation of any dwelling. The scheme shall be fully implemented prior to occupation of any dwelling and shall be retained thereafter.
Reason: In the interest of amenity and in order to minimise danger, obstruction and inconvenience to users of the highway and the premises. |
13)
Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 1995, or any amendments thereto, the parking provision on the site shall not be used for any purpose, other than as parking provision, unless permission has been granted by the Local Planning Authority on an application made for that purpose.
Reason: To retain off-street parking provision and thereby minimise the potential for on-street parking which could adversely affect the convenience of road users. |
14)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 15/1167/01, 15/1167/02 and 15/1167/03
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|