| Conditions or Reasons: | 1)
The development shall begin not later than three years from the date of this permission. REASON: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Before development commences, an investigation and risk assessment of the site shall be carried out to identify possible contamination to ground, soil and sensitive receptors to determine measures necessary to remove, neutralise, and isolate such contamination. Any assessments should use the appropriate, authoritative and scientifically based guideline values. Details of such investigation, assessment and the measures proposed shall be submitted to and approved in writing by the District Planning Authority and the development shall thence proceed only in accordance with the measures as approved. Where remediation measures are necessary a Remediation Strategy shall be provided giving full details of the remediation measures required and how they are to be undertaken. On completion of those works a verification report shall be provided confirming the remediation measures that have been undertaken in accordance with the Remediation Strategy and setting out measures for further monitoring and reporting as necessary. If, during development, contamination not previously identified is found to be present at the site, then no further development (unless otherwise agreed in writing with the District Planning Authority) shall be carried out until the developer has submitted a Remediation Strategy or obtained written approval from the District Planning Authority for an addendum to an existing Remediation Strategy, the addendum of which must detail how this unsuspected contamination shall be dealt with and from the date of approval of the addendum(s) shall form part of the Remediation Strategy. REASON: To ensure that any site contamination is dealt with safely in the interests of the health and safety of the public and users of the development hereby permitted. (Policy BE8, S.B.L.P.R). |
3)
Before development begins, a landscaping scheme to include any hard surfaces and earth mounding shall be submitted to and approved in writing by the District Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season and maintained until satisfactorily established. REASON: To ensure a satisfactory standard of landscaping. (Policy BE8, S.B.L.P.R). |
4)
Before the development is first occupied or brought into use, the parking scheme shown on Drawing No. 811.1 shall be completed and thereafter retained for this purpose. REASON: To ensure provision for car parking clear of the highway. (Policy T10, S.B.L.P.R). |
5)
Before development begins, the positions of the dwellings shall be pegged out on site and their positions approved in writing by the District Planning Authority. REASON: To enable consideration to be given to the precise layout of the development. (Policy BE8, S.B.L.P.R). |
6)
Before development begins and notwithstanding the details submitted with the application, details of the materials to be used for the external walls and roofs of the proposed building/s shall be submitted to and approved in writing by the District Planning Authority. The development shall thereafter be carried out in accordance with the approved details. REASON: To control the appearance of the building/s. (Policies BE8 & H8, S.B.L.P.R). |
7)
Development shall not begin until details of the junction of the proposed vehicular access with the highway have been approved by the District Planning Authority and no building shall be occupied until the junction has been constructed in accordance with the approved details. REASON: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. |
8)
Before the access is first brought into use a triangular vision splay shall be provided on each side of the new access and shall measure 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level. REASON: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it. |
9)
The proposed vehicular access shall be surfaced in bituminous or other similar durable material as may be approved in writing by the District Planning Authority for a distance of five metres into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway. REASON: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety. |
10)
No development shall commence until wheel-cleaning facilities have been provided at all site exits in accordance with a scheme submitted to and approved in writing by the District Planning Authority. The approved facilities shall be installed and made operational before development commences and the Site Developer(s) shall ensure that all vehicles exiting the site use the approved wheel cleaning facilities. The wheel cleaning facilities shall be retained until the development has been substantially completed or until such time as the District Planning Authority is satisfied that the roadworks necessary to provide adequate and clean access to and from the public highway have been completed (apart from final surfacing). REASON: In the interests of the amenity and to prevent the deposit of mud or other extraneous material on the highway during the construction period. |
11)
This permission relates only to the details shown on the Location Plan, Block Plan and Drawings Nos. 811.1 & 811.2 received 01/07/08 or to any subsequent appropriately endorsed revised plan. REASON: To identify the approved plans and to avoid doubt. |
|
|---|