| Conditions or Reasons: | 1)
The development shall begin not later than three years from the date of this permission. REASON: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
New external facing and roofing materials shall match those of the existing building as closely as possible. REASON: To ensure that the development is in keeping with the existing building. (Policies BE8 & H8, S.B.L.P.R). |
3)
Before development commences, an investigation and risk assessment of the site shall be carried out to identify possible contamination to ground, soil and sensitive receptors to determine measures necessary to remove, neutralise, and isolate such contamination. Any assessments should use the appropriate, authoritative and scientifically based guideline values. Details of such investigation, assessment and the measures proposed shall be submitted to and approved in writing by the District Planning Authority and the development shall thence proceed only in accordance with the measures as approved. Where remediation measures are necessary a Remediation Strategy shall be provided giving full details of the remediation measures required and how they are to be undertaken. On completion of those works a verification report shall be provided confirming the remediation measures that have been undertaken in accordance with the Remediation Strategy and setting out measures for further monitoring and reporting as necessary. If, during development, contamination not previously identified is found to be present at the site, then no further development (unless otherwise agreed in writing with the District Planning Authority) shall be carried out until the developer has submitted a Remediation Strategy or obtained written approval from the District Planning Authority for an addendum to an existing Remediation Strategy, the addendum of which must detail how this unsuspected contamination shall be dealt with and from the date of approval of the addendum(s) shall form part of the Remediation Strategy. REASON: To ensure that any site contamination is dealt with safely in the interests of the health and safety of the public and users of the development hereby permitted. (Policy BE8, S.B.L.P.R). |
4)
Development shall not begin until a vehicle crossing over the footway/verge fronting the existing property and to serve the new property has been constructed in accordance with Section 184 of the 1980 Highway Act and in accordance with a scheme to be submitted to and approved by the District Planning Authority. REASON: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. |
5)
Before the access is first brought into use a triangular vision splay shall be provided on each side of the new access and shall measure 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level. REASON: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them. |
6)
Before the accesses are brought into use an area of land across the whole of the site frontage and the existing dwelling measuring at least 1.8m from the parallel to the nearside edge of the adjacent road carriageway shall be provided and thereafter be kept free of all obstruction to visibility. REASON: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them. |
7)
Any gates provided shall open away from the highway and be set back a distance of at least 5.0m from the nearside edge of the carriageway of the adjoining highway. REASON: To enable vehicles to draw off the highway before the gates are opened. |
8)
Before the premises are occupied all on site vehicular areas shall be surfaced in a manner to the District Planning Authority's approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway. REASON: In order to minimise danger, obstruction and inconvenience to users of the highway and of the premises. |
9)
Notwithstanding the details submitted, before development begins, a scheme for the parking of vehicles on the site shall be submitted to and approved in writing by the District Planning Authority. The scheme shall comply with the standards of the District Planning Authority and shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose. REASON: To ensure provision for car parking clear of the highway. (Policy T10, S.B.L.P.R). |
10)
This permission relates only to the details shown on Drawing No. 2393.08 received 16/07/08 or to any subsequent appropriately endorsed revised plan. REASON: To identify the approved drawing and to avoid doubt. |
|
|---|