| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
No development shall take place until the following has been submitted to and approved in writing by the Local Planning Authority:
A Phase 1 desk Study report documenting the ground conditions of the site with regard to potential contamination, incorporating appropriate soils and gas sampling and adhering to BS 10175.
Reason: To protect human health and environment. |
3)
No part of the building hereby permitted shall be constructed until samples of the materials to be used in the construction of the external surfaces of the development have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Policy 43, DSCB) |
4)
Notwithstanding the provisions of Part 1 Class E of Schedule 2 to the Town and Country (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the development in the interests of the visual amenity of the area. (Policy 43, DSCB) |
5)
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no windows or other openings shall be inserted into any of the elevations of the dwelling without the grant of further specific planning permission from the Local Planning Authority.
Reason: To protect the privacy of neighbouring residents. (Policy 43, DSCB) |
6)
Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the external appearance of the building/s in the interests of the amenities of the area. (Policy 43 DSCB) |
7)
The planting and landscaping scheme shown on approved Drawing No. 03 shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season shall mean the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season with others of a similar size and species.
Reason: To ensure an acceptable standard of landscaping. (Policies 43 and 58, DSCB) |
8)
Before the premises are occupied all on site vehicular areas shall be surfaced in a stable and durable manner (not loose aggregate) in accordance with details to be approved in writing by the Local Planning Authority. Arrangements shall be made for surface water drainage from the site to soakaway away within the site so that it does not discharge into the highway or into the main drainage system
Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highways safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits. |
9)
Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 1995, or any amendments thereto, the vehicle parking provision on the site shall not be used for any purposes, other than as vehicle parking provision, unless permission has been granted by the Local Planning Authority on an application made for that purpose.
Reason: To retain of-street parking provision and thereby minimise the potential for on street parking which could adversely affect the convenience of road users. |
10)
The cycle parking provision indicated on the approved drawing no. 03 shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose.
Reason: To ensure the provision of adequate cycle parking to meet the needs of occupiers of the proposed development in the interests of encouraging the use of sustainable modes of transport. |
11)
No occupation of any permitted building shall take place until the following has been submitted to and approved in writing by the Local Planning Authority:
Where shown to be necessary by the Phase 2 Site Investigation a detailed Phase 3 remediation scheme with measures to be taken to mitigate any risks to human health, groundwater and the wider environment. Any works which form part of the Phase 3 scheme approved by the local authority shall be completed in full before any permitted building is occupied.
The effectiveness of any scheme shall be demonstrated to the Local Planning Authority by means of a validation report (to incorporate photographs, materials transport tickets and validation sampling), unless an alternative period is approved in writing by the Authority. Any such validation should include responses to any unexpected contamination discovered during works.
The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to. The British Standard for Subsoil, BS 8601 Specification for subsoil and requirements for use, should also be adhered to.
There is a duty to assess for Asbestos Containing Materials (ACM) during development and measures undertaken during removal and disposal should protect site workers and future users, while meeting the requirements of the HSE.
Applicants are reminded that, should groundwater or surface water courses be at risk of contamination before, during or after development, the Environment Agency should be approached for approval of measures to protect water resources separately, unless an Agency condition already forms part of this permission.
Reason: To protect human health and the environment. |
12)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 03 and ASC/12/330.
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|