<< Back to case
Conditions or Reasons for Planning Application - CB/15/02194/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality.
(Policies BE8 & H8, SBLPR and Policy 43, DSCB)
3) The development hereby permitted shall not be first occupied until all on site vehicular areas as shown on approved plan 015-019-001 have been constructed and have been surfaced in a stable and durable manner and arrangements made for the interception and drainage of surface water within the site, so that it does not discharge into the highway or into the main drainage system. The vehicular parking areas shall be retained as such thereafter.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits.
(Policy T10, SBLPR and Policy 27, DSCB)
4) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 015-019-001, 015-019-002, 015-019-003 and 015-019-004.

Reason: To identify the approved plans and to avoid doubt.


Return to Search | Close WindowTop of Page