Conditions or Reasons for Planning Application - CB/16/01572/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) No development shall take place until details of the method of disposal of surface water drainage (which shall include details of soakaways) have been submitted to and agreed in writing by the Local Planning Authority, including any land drainage system. Thereafter no part of the development shall be occupied or brought into use until the approved drainage scheme has been implemented.

Reason: To ensure that adequate surface water drainage is provided and that existing and future land drainage needs are protected. (Policies 43 and 44, DSCB) This condition is required to be pre-commencement as it may affect the levels of the site, which would need to be agreed before any construction took place.
3) Before the development hereby permitted is first occupied or brought into use, the scheme for access, parking, garaging and manoeuvring shown on Drawing No DSM/01/2016/07 shall be laid out, drained and surfaced in accordance with details previously submitted to and approved in writing by the Local Planning Authority and those areas shall not thereafter be used for any other purpose.

Reason: To enable vehicles to draw off, park and turn clear of the highway to minimise danger, obstruction and inconvenience to users of the adjoining highway.
4) The proposed vehicular access shall be constructed and surfaced in a bituminous or other similar durable material as may be approved in writing by the Local Planning Authority for a distance of 5m into the site, measured from the highway boundary, before being brought into use. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: To avoid the carriage of mud, gravel or other extraneous material or surface water from the site into the highway so as to safeguard the interest of the highway.
5) Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 1995, or any amendments thereto, the garage accommodation on the site shall not be used for any purpose, other than as garage accommodation, unless permission has been granted by the Local Planning Authority on an application made for that purpose.

Reason: To retain off-street parking provision and thereby minimise the potential for on-street parking which could adversely affect the convenience of road users.
6) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality.
(Section 7, NPPF)
7) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers BD275651, DSM/01/2016/07.

Reason: To identify the approved plan/s and to avoid doubt.