Conditions or Reasons for Planning Application - CB/16/01849/VOC
Conditions or Reasons:
1) The development hereby approved shall be commenced within three years of the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 which is designed to ensure that a planning permission does not continue in existence indefinitely if the development to which it relates is not carried out.
2) No development shall commence on the existing buildings until a scheme setting out the timetable to address the six mitigation recommendations set out in Ecological Assessment dated February 2013 shall be submitted and approved in writing by the Local Planning Authority and the mitigation measure retained thereafter.

Reason: The condition must be discharge prior to commencing works of the existing barns to ensure satisfactory protection of all species from the beginning of the construction phase on the barns and to ensure a net gain for biodiversity can be achieved as a result of the development.
3) All external works hereby permitted shall be carried out in materials to match as closely as possible in colour, type and texture, those of the existing building.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match/complement the existing building(s) and the visual amenities of the locality.
4) Before first occupation of the approved development, vehicle access and junction arrangement serving the development shall be completed in accordance with the approved plans, and within the public highway shall be constructed to the specification of the Highway Authority and satisfaction of the Local Planning Authority.

Reason: To ensure the provision of an access appropriate
5) Concurrent with the new access being brought into use all other existing vehicle access points not incorporated in the development hereby permitted shall be stopped up by reinstating the verge and highway boundary to the same line, level and detail as the adjoining verge and highway boundary.

Reason: In the interests of highway safety.
6) The scheme for parking, and vehicle manoeuvring indicated on the submitted plans shall be laid out prior to the initial occupation of the development hereby permitted and that shall not thereafter be used for any other purpose.

Reason: To ensure that vehicles can draw off, park and turn clear of the highway to minimise danger, obstruction and inconvenience to users of the adjoining highway.
7) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers SS/1, SS/2, SS/3, 14113

Reason: To identify the approved plan/s and to avoid doubt.