Conditions or Reasons for Planning Application - CB/16/02139/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) No above ground construction works shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Policy BE8 & H2, SBLPR and Section 7, NPPF)
3) No development shall take place until a written scheme of archaeological investigation; that adopts a staged approach and includes post excavation analysis and publication, has been submitted to and approved in writing by the Local Planning Authority. The said development shall only be implemented in full accordance with the approved archaeological scheme.

Reason: This condition is pre-commencement as a failure to secure appropriate archaeological investigation in advance of development would be contrary to paragraph 141 of the National Planning Policy Framework (NPPF) that requires developers to record and advance of understanding of the significance of any heritage assets to be lost (wholly or in part) as a consequence of the development.
(Section 12, NPPF)
4) No development shall take place until details of access arrangements, for vehicles, to the site from the public highway have been submitted to and approved in writing by the Local Planning Authority and the building shall not be first occupied until the junction of the proposed vehicular access with the highway has been constructed in accordance with the approved details.

Reason: The condition must be discharged pre-commencement as it has to be established that rights exist for vehicles to access and park on the site, and in order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
(Section 4, NPPF)
5) Before the access is brought into use an area of land across the whole of the site frontage measuring at least 2m from and parallel to the nearside edge of the adjacent road carriageway shall be provided and thereafter be kept free of all obstruction to visibility; this shall also include boundary fences within land under the applicant's control.

Reason: To provide adequate visibility between the existing highway and the access, and to make the access safe and convenient for the traffic which is likely to use it.
(Section 4, NPPF)
6) Before the premises are occupied all on site vehicular areas shall be surfaced in a stable and durable material in accordance with details to be approved in writing by the Local Planning Authority. Arrangements shall be made for surface water drainage from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits.
(Section 4, NPPF)
7) Prior to the occupation of any dwelling on the site, a scheme for the provision of waste receptacles for each dwelling shall be submitted to and agreed in writing by the Local Planning Authority. The receptacles shall be provided before occupation takes place.

Reason: In the interest of residential amenity and to reduce waste generation in accordance with the Councils's Minerals and Waste Local Plan 2014, Policy WSP5 and the adopted SPD "Managing Waste in New Developments" (2006).
8) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 628/sk4 A, CBC/001.

Reason: To identify the approved plans and to avoid doubt.