| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
No development shall take place until samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Section 7, NPPF) |
3)
No development shall take place until details of the existing and final ground and slab levels of the buildings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.
Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas. (Section 7, NPPF) |
4)
Prior to the commencement of development, a scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected along the boundary of the site. The boundary treatment shall be completed in accordance with the approved scheme and be thereafter retained.
Reason: To safeguard the appearance of the completed development and the visual amenities of the locality. (Section 7, NPPF) |
5)
No development shall take place until a written scheme of archaeological investigation; that adopts a staged approach and includes post excavation analysis and publication, has been submitted to and approved in writing by the Local Planning Authority. The said development shall only be implemented in full accordance with the approved archaeological scheme.
Reason: (1) In accordance with paragraph 141 of the National Planning Policy Framework; to record and advance the understanding of the significance of the heritage assets with archaeological interest which will be unavoidably affected as a consequence of the development and to make the record of this work publicly available.
(2) This condition is pre-commencement as a failure to secure appropriate archaeological investigation in advance of development would be contrary to paragraph 141 of the National Planning Policy Framework that requires the recording and advancement of understanding of the significance of any heritage assets to be lost (wholly or in part). |
6)
No development shall take place until a landscaping scheme to include all hard and soft landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.
Reason: To ensure an acceptable standard of landscaping. (Sections 7 & 11, NPPF) |
7)
No equipment, machinery or materials shall be brought on to the site for the purposes of development until details of substantial protective fencing for the protection of any retained trees, as shown on approved drawing no. PA/SO/16/007/003 rev A, has been submitted to and approved in writing by the Local Planning Authority and the fencing has been erected in accordance with the approved details. The approved fencing shall be maintained until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made.
Reason: To protect the trees so enclosed in accordance with Section 8 of BS 5837 of 2012 or as may be subsequently amended. (Sections 7 & 11, NPPF) |
8)
Notwithstanding the provisions of Part 1, Classes A, B, C and E of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions or other material alterations, including window openings, to the buildings hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the external appearance of the building/s in the interests of the amenities of the area. (Section 7, NPPF) |
9)
The dormer windows and rooflights in the northern elevation and first floor windows in the eastern and western elevations of the development hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through it at all times and shall be non-opening, unless the parts of the windows which can be opened are more than 1.7m above the floor of the rooms in which the windows are installed. No further windows or other openings shall be formed in the any elevation of the building hereby approved.
Reason: To safeguard the privacy of occupiers of adjoining properties. (Section 7, NPPF) |
10)
The sill height of the velux windows in the southern elevation of the development hereby permitted shall be located more than 1.7m above the floor of the rooms in which the windows are installed.
Reason: To safeguard the privacy of occupiers of adjoining properties. (Section 7, NPPF) |
11)
All works to or affecting trees on or adjoining the site shall be carried out in accordance with the relevant recommendations of BS3998 2010.
Reason: To safeguard the existing trees on the site in the interests of visual amenity. (Sections 7 & 11, NPPF) |
12)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers PA/SO/16/007/001/ rev A; PA/SO/16/007/002; PA/SO/16/007/003/ rev A; PA/SO/16/007/004; Heritage Statement, Heritage Network, Report no. 987; Design and Access Statement
Reason: To identify the approved plans and to avoid doubt. |
|
|---|