Conditions or Reasons for Planning Application - CB/16/03912/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) No development shall take place relating to the construction of the dwellings hereby approved until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
3) Prior to the occupation of the dwellings hereby approved a landscaping scheme to include all hard and soft landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The scheme shall include the provision of residential amenity space in accordance with the adopted Design Guide. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Policy DM3 CSDMP)
4) Prior to the occupation of the first of the dwellings hereby approved details of a bin storage/refuse collection point located outside of the public highway shall be submitted to and approved in writing by the Local Planning Authority. The works shall be carried out in accordance with the approved details prior to the occupation of the approved dwelling.

Reason: In the interests of amenity and in order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
5) The dwelling hereby permitted shall not be occupied until the access, parking areas and turning area shown on drawing number 778 01A have been laid out, drained and surfaced in accordance with details previously submitted to and approved in writing by the Local Planning Authority and those areas shall not thereafter be used for any other purpose.

Reason: To enable vehicles to draw off, park and turn clear of the highway to minimise danger, obstruction and inconvenience to users of the adjoining highway.
6) A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme before the first dwelling hereby approved is occupied and be thereafter retained.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
(Policy DM3 CSDMP)
7) Before (any of) the accesses is first brought into use, a triangular vision splay shall be provided on each side of the new access drive and shall be 2.8m measured along the back edge of the highway from the centre line of the anticipated vehicle path to a point 2.0m measured from the back edge of the highway into the site along the centre line of the anticipated vehicle path. The vision splay so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.

Reason: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them.
8) Visibility splays shall be provided at the junction of the access with the public highway before the development is brought into use. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the proposed access from its junction with the channel of the public highway and 120.0m measured from the centre line of the proposed access along the line of the channel of the public highway. The required vision splays shall for the perpetuity of the development remain free of any obstruction to visibility.

Reason: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them.
9) The proposed vehicular access shall be surfaced in bituminous or other similar durable material as may be approved in writing by the Local Planning Authority for a distance of 5.0m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety.
10) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, Drawing Numbers 778/LP1, 778/SP1, 778 01A, 778 02, 778 03 and 7487-01 Rev 0.

Reason: To identify the approved plans and to avoid doubt.