Conditions or Reasons for Planning Application - CB/16/04003/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) No development shall take place until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Policy DM3, CSDM)
3) The dwellings hereby permitted shall only be occupied by a person solely or mainly employed, or last employed, in agriculture as defined in Section 336(1) of the Town and Country Planning Act 1990, or in forestry, or a widow or widower of such a person and any resident dependents.

Reason: The Local Planning Authority would not permit the conversion and extension of redundant buildings without an agricultural or forestry need being established.
(Policy DM4, CSDM)
4) Visibility splays shall be provided at the junction of the access with the public highway before the development is brought into use. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the proposed access from its junction with the channel of the public highway and 215.0m measured from the centre line of the proposed access along the line of the channel of the public highway. The required vision splays shall for the perpetuity of the development remain free of any obstruction to visibility.

Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it.
5) The proposed development shall be carried out and completed in all respects in accordance with the parking layout and spaces indicated, and refuse collection point illustrated on the approved drawing no. 62015/5B and defined by this permission and, notwithstanding the provision of the Town and Country Planning General Permitted Development Order 2015, (or any Order revoking or re-enacting that Order) there shall be no variation without the prior approval in writing of the Local Planning Authority. The refuse collection point shall be fully implemented prior to occupation of any dwelling and shall be retained thereafter.

Reason: To ensure that the development of the site is completed insofar as its various parts are interrelated and dependent one upon another and to provide adequate and appropriate access arrangements at all times.
6) A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, planting (including species and density), materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme before the first dwelling is occupied and be thereafter retained.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
(Policy DM3, CSDM)
7) Neither dwelling hereby approved shall be occupied until a landscaping scheme to include all hard and soft landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Sections 7 & 11, NPPF)
8) Notwithstanding the provisions of Part 1, Class A, B and C of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building(s) hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.

Reason: The dwelling has been granted as an exception to policy as a dwelling to house a full time agricultural worker. The size of dwelling has been considered to enable a worker and their family to establish a way of life. The Council would wish to be able to further consider any proposals to enlarge the dwelling in the future in the interests of ensuring it is of a size suitable for its purpose and in the interests of increasing built form and its impact on the character of the open countryside.
(Section 7, NPPF)
9) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers Drawing Numbers 62015/1, 62015/2, 62015/3 B, 62015/4 A, 62015/5 B and CBC/001.

Reason: To identify the approved plan/s and to avoid doubt.