Conditions or Reasons for Planning Application - CB/16/04589/OUT
Conditions or Reasons:
1) No development shall commence at the site before details of the access, layout, scale, appearance and landscaping, including boundary treatments (hereinafter called "the reserved matters") relating to that Phase have been submitted to and approved in writing by the local planning authority. The development shall be carried out as approved.

Reason: To comply with Article 3 of the Town and Country Planning (General Development Procedure) Order 2015.
2) An application for approval of the reserved matters shall be made to the local planning authority not later than three years from the date of this permission.

Reason: To comply with Section 92 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
3) The development hereby permitted shall begin not later than two years from the date of approval of the last of the reserved matters to be approved.

Reason: To comply with Section 92 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
4) No development shall take place until a Construction Management Plan detailing access arrangements for construction vehicles, on-site parking, loading and unloading areas, materials storage areas and wheel cleaning arrangements shall be submitted to and approved in writing by the Local Planning Authority. The construction of the development shall be carried out in accordance with the approved Construction Management Plan.

Reason: In the interest of highway safety, to ensure a satisfactory standard of construction and layout for the development and to comply with Policy DM3 of the Core Strategy and Development Management Policies 2009.
5) Any application for reserved matters shall include details of the existing and final ground, ridge and slab levels of the buildings. The details shall include sections through both the site and the adjoining properties and the proposal shall be developed in accordance with the approved details.

Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas in accordance with policy DM3 of the Core Strategy and Development Management Policies (2009).
6) No development shall commence at the site before a detailed surface water drainage scheme for the site has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of a site specific ground investigation report (in accordance with BRE 365 standards) to determine the infiltration capacity of the underlying geology and ground water level, as well as details of how the scheme shall be maintained and managed after completion. The scheme shall include provision of attenuation and a restriction in run-off to agreed rates. The scheme shall be implemented in accordance with the approved final details before the development is completed and shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan.

Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with para 103 NPPF.
7) No development shall take place at the site before a Method Statement detailing how retained trees and hedgerows will be protected at the site has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out as approved.

Reason: To ensure that trees and hedgerows are properly protected at the site in accordance with Policy DM3 of the Central Bedfordshire Core Strategy and Development Management Policies (2009).
8) In the event that contamination is found at any time when carrying out the development, it shall be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment shall then be undertaken by a competent person, in accordance with 'Model Procedures for the Management of Land Contamination, CLR 11'. A written report of the findings should be forwarded for approval to the Local Planning Authority. Following completion of remedial measures a verification report shall be prepared that demonstrates the effectiveness of the remediation carried out. No part of the development should be occupied until all remedial and validation works are approved in writing.

Reason: To protect human health and the environment in accordance with Policy DM3 of the Core Strategy and Development Management Policies Document (2009).
9) The dwellings at the site shall have a maximum of one storey and shall not contain accommodation in the roof spaces.

Reason: To ensure that the development would be of an appropriate density for its context and would help meet the need for accommodation for older people in Central Bedfordshire in accordance with Policy DM3 of the Central Bedfordshire Council Core Strategy and Development Management Policies (2009).
10) No development shall commence at the site before a scheme for biodiversity enhancement at the site including a timetable for its delivery has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

Reason: To ensure a net gain in biodiversity at the site in accordance with the requirements of the National Planning Policy Framework (2012).
11) No development shall commence at the site before details of the junction between the proposed estate road and the highway and the provision of a pavement along the northern boundary of the site have been submitted to and approved in writing by the Local Planning Authority and no building shall be occupied until that junction has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and of the proposed estate road in accordance with Policy DM3 of the Central Bedfordshire Core Strategy and Development Management Policies (2009).
12) An application for the approval of Reserved Matters at the site shall include details of turning areas suitable for vehicles likely to need to access the site and no building shall be occupied until those turning areas have been constructed in accordance with the approved details.

Reason: To enable vehicles to draw off, park and turn outside the highway limits thereby avoiding the reversing of vehicles on to the highway in accordance with Policy DM3 of the Central Bedfordshire Core Strategy and Development Management Policies (2009).
13) Other than where specifically required by a condition attached to this decision the development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans and reports referenced HD0125-1a, D5686-02a, HD0125-4 and Design, Access and Planning Statement dated October 2016

Reason: To identify the approved plan/s and to avoid doubt.