| Conditions or Reasons: | 1)
The development shall begin not later than three years from the date of this permission. REASON: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Before development begins, details of the levels of the new dwellings shall be submitted to and approved in writing by the council and development shall thereafter be implemented accordingly. REASON: To produce a satisfactory relationship between the various elements of the scheme and adjacent properties. (Policy BE8, S.B.L.P.R.). |
3)
Before development begins, the position of the dwellings shall be pegged out on site and their positions approved in writing by the council. REASON: To enable consideration to be given to the precise layout of the development. (Policy BE8, S.B.L.P.R.). |
4)
Before development begins, samples of the materials to be used for the external walls and roofs of all new buildings shall be submitted to and approved in writing by the council. The development shall thereafter be carried out in accordance with the approved details. REASON: To control the appearance of the building/s. (Policy BE8, S.B.L.P.R.). |
5)
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building/s hereby permitted shall be carried out without the grant of further specific permission from the council. REASON: To control the external appearance of the buildings in the interests of the amenities of the area. (Policy BE8, S.B.L.P.R.). |
6)
Notwithstanding the provisions the Town and Country (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific permission from the council. REASON: To control the development in the interests of the amenities of the area. (Policy BE8, S.B.L.P.R.). |
7)
Prior to the commencement of any phase of development approved by this planning permission the developer shall submit to the council, in both paper and electronic form where possible: A Phase I Desk Study incorporating a site walkover, site history, maps and all further features of industry best practice relating to potential contamination. Where shown to be necessary by the Phase I Desk Study, a Phase II Site Investigation report further documenting the ground conditions of the site with regard to potential contamination, incorporating appropriate soils and gas sampling. Where shown to be necessary by the Phase II investigation, a Phase III detailed scheme for remedial works and measures to be taken to mitigate any risks to human health, groundwater and the wider environment. On completion of the development, the developer shall provide written confirmation that all works have been completed in accordance with the agreed remediation scheme in the form of a Phase IV validation report to incorporate photographs, material transport tickets and sampling. Any remediation scheme and any variations shall be agreed in writing by the local planning authority prior to the commencement of works. This should include responses to any unexpected contamination discovered during works. REASON: To protect human health and the environment. |
8)
Development shall not begin until details of the junction of the proposed vehicular access with the highway have been approved by the council and no building shall be occupied until the junction has been constructed in accordance with the approved details. REASON: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. |
9)
Before the access is first brought into use a triangular vision splay shall be provided on each side of the new access and shall measure 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m measured into the site at right angles to the same line along the side of the new access drive. The vision splays so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level. REASON: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it. |
10)
The proposed vehicular access shall be surfaced in bituminous or other similar durable material as may be approved in writing by the council for a minimum distance of 5m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway. REASON: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety. |
11)
Any gates provided shall open away from the highway and be set back a distance of at least 5.0m from the nearside edge of the carriageway of the adjoining highway. REASON: To enable vehicles to draw off the highway before the gates are opened. |
12)
Before the new access is first brought into use, any existing access within the frontage of the land to be developed, not incorporated in the access hereby approved shall be closed in a manner to the council's written approval. REASON: In the interest of road safety and to reduce the number of points at which traffic will enter and leave the public highway. |
13)
No development shall commence until wheel-cleaning facilities have been provided at all site exits in accordance with a scheme submitted to and approved in writing by the council. The approved facilities shall be installed and made operational before development commences and the Site Developer(s) shall ensure that all vehicles exiting the site use the approved wheel cleaning facilities. The wheel cleaning facilities shall be retained until the development has been substantially completed or until such time as the council is satisfied that the roadworks necessary to provide adequate and clean access to and from the public highway have been completed (apart from final surfacing). REASON: In the interests of the amenity and to prevent the deposit of mud or other extraneous material on the highway during the construction period. |
14)
Before development begins, a landscaping scheme to include any hard surfaces and earth mounding shall be submitted to and approved in writing by the council. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained for a period of five years from the date of planting and any which die or are destroyed during this period shall be replaced during the next planting season and maintained until satisfactorily established. REASON: To ensure a satisfactory standard of landscaping. (Policy BE8, S.B.L.P.R.). |
15)
This permission relates only to the details shown on Drawings Nos. 21209/A and 8509 received 13/05/09 or to any subsequent appropriately endorsed revised plan. REASON: To identify the approved drawings and to avoid doubt. |
|
|---|