Conditions or Reasons for Planning Application - CB/16/05028/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) Prior to the construction phase of the dwellings hereby approved, notwithstanding the details submitted with the application, full details of the materials to be used for the external walls and roofs of the development hereby approved shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Policy BE8, SBLPR & Section 7, NPPF)
3) A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme before the buildings are first occupied and be thereafter retained.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
(Policy BE8 SBLPR & Section 7, NPPF)
4) Prior to the first occupation of any dwelling on the site, a scheme for the provision of waste receptacles for each dwelling shall be submitted to and agreed in writing by the Local Planning Authority. The receptacles shall be provided before occupation takes place.

Reason: In the interest of residential amenity and to reduce waste generation in accordance with the Councils's Minerals and Waste Local Plan 2014, Policy WSP5 and the adopted SPD "Managing Waste in New Developments" (2006).
5) The first floor windows in the side elevations of both of the dwellings hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through them at all times and shall be non-opening, unless the parts of the windows which can be opened are more than 1.7m above the floor of the rooms in which the windows are installed. No further windows or other openings shall be formed in the side elevations.

Reason: To safeguard the privacy of occupiers of adjoining properties.
(Policy BE8 SBLPR & Section 7, NPPF)
6) No dwelling shall be first occupied until a scheme to improve the highway along the frontage of the site has been constructed in accordance with details of the approved drawing/or scheme to be submitted to and approved by the Local Planning Authority. Any Statutory Undertakers equipment or street furniture shall be resited to provide an unobstructed footway.

Reason: In the interests of road safety and pedestrian movement.
(Section 4, NPPF)
7) Before either access is first brought into use an area of land across the whole of the site frontage measuring at least 2.4m from and parallel to the nearside edge of the adjacent road carriageway shall be provided and thereafter be kept free of all obstruction to visibility.

Reason: To provide adequate visibility between the existing highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which are likely to use them.
(Section 4, NPPF)
8) Development shall not begin until details of the junctions of the proposed vehicular accesses with the highway have been approved by the Local Planning Authority and no dwelling shall be first occupied until those junctions have been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
(Section 4, NPPF)
9) Visibility splays shall be provided at all private means of access from individual properties within the site onto School Lane. This vision splay shall be provided on each side of the access drive and shall be 2.8m measured along the back edge of the new highway from the centre line of the anticipated vehicle path to a point 2.0m measured from the back edge of the footway into the site along the centre line of the anticipated vehicle path. The vision splay so described and on land under the dwelling occupier's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.

Reason: To provide adequate visibility between the new estate road and the new individual accesses, and to make the accesses safe and convenient for the traffic which is likely to use them.
(Section 4, NPPF)
10) Before the dwellings are first occupied all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises.
(Section 4, NPPF)
11) Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the buildings hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.

Reason: To control the amount of development on the plots in the interests of the amenities of future occupiers and the character of the area.
(Policy BE8, SBLPR & Section 7, NPPF)
12) The dwellings hereby approved shall not be first occupied until details of the bin storage/collection areas have been submitted to and approved in writing by the Local Planning Authority and the bin storage/collection areas have been implemented in accordance with the approved details. The bin storage/collection areas shall be retained thereafter.

Reason: In the interest of amenity.
(Policy BE8 SBLPR & Section 7, NPPF)
13) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers CBC/001 - CBC/008.

Reason: To identify the approved plans and to avoid doubt.