<< Back to case
Conditions or Reasons for Planning Application - CB/09/05154/FULL
Conditions or Reasons:
1) The development shall begin not later than three years from the date of this permission.
REASON: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) New external brickwork and roofing materials shall match those of the existing building as closely as possible.
REASON: To ensure that the development is in keeping with the existing building.
(Policies BE8 & H8 S.B.L.P.R).
3) Before development begins, a scheme for screen fencing and/or screen walling shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained.
REASON: To safeguard the amenity of the area.
(Policy BE8 S.B.L.P.R).
4) Before the development is first occupied or brought into use, the parking scheme shown on Drawing No. 07/24A shall be completed and thereafter retained for this purpose.
REASON: To ensure provision for car parking clear of the highway.
(Policy T10 S.B.L.P.R).
5) Development shall not begin until details of the junction of the proposed vehicular access with the highway have been approved by the Local Planning Authority and no building shall be occupied until the junction has been constructed in accordance with the approved details.
REASON: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
6) The proposed vehicular access shall be surfaced in bituminous or other similar durable material as may be approved in writing by the Local Planning Authority for a distance of 5m into the site, measured from the highway boundary, before the premises are occupied. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
REASON: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety.
7) This permission relates only to the details shown on Drawing No. 07/24A received 02/07/09 and 07/23 received 26/05/09 or to any subsequent appropriately endorsed revised plan.
REASON: To identify the approved drawings and to avoid doubt.


Return to Search | Close WindowTop of Page