Conditions or Reasons for Planning Application - CB/16/05915/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) Prior to the construction phase of the dwelling hereby approved, notwithstanding the details submitted with the application, full details of the materials to be used for the external walls and roofs of the development hereby approved shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Policy BE8, SBLPR & Section 7, NPPF)
3) Prior to the occupation of the dwelling on the site, a scheme for the provision of waste receptacles for the dwelling shall be submitted to and agreed in writing by the Local Planning Authority. The receptacles shall be provided before first occupation takes place.

Reason: In the interest of residential amenity and to reduce waste generation in accordance with the Councils's Minerals and Waste Local Plan 2014, Policy WSP5 and the adopted SPD "Managing Waste in New Developments" (2006).
4) The first floor windows in the side elevations of the dwelling hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through them at all times and shall be non-opening, unless the parts of the windows which can be opened are more than 1.7m above the floor of the rooms in which the windows are installed. No further windows or other openings shall be formed in the side elevations.

Reason: To safeguard the privacy of occupiers of adjoining properties
(Policy BE8 SBLPR & Section 7, NPPF)
5) The dwelling shall not be first occupied until details of the construction and surfacing of the on site vehicular access have been submitted to and approved in writing by the Local Planning Authority. These details shall include arrangements for surface water drainage from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system. The access shall be constructed and surfaced in a stable and durable manner in accordance with the approved details for a distance of 5.5m into the site, measured from the highway boundary before the dwelling is first occupied.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure acceptable parking of vehicles outside highway limits .
(Section 4, NPPF)
6) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers L-01, L-02 Rev A & L-03 Rev A.

Reason: To identify the approved plans and to avoid doubt.