Conditions or Reasons for Planning Application - CB/17/00129/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) No development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Policy BE8, SBLPR and Section 7, NPPF.)
3) No building shall be occupied until the junction of the proposed vehicular access with the highway has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
(Policies BE8 & T10, SBLPR and Section 4, NPPF.)
4) Before the premises are occupied all on site vehicular areas shall be surfaced in a stable and durable material in accordance with details to be approved in writing by the Local Planning Authority. Arrangements shall be made for surface water drainage from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits.
(Section 4, NPPF)
5) No development shall commence until details of a method statement to prevent and deal with site debris from being deposited on the public highway have been submitted to and approved in writing by the Local Planning Authority.  The approved method statement shall be implemented throughout the construction works and until the completion of the development.

Reason: In the interests of highway safety and to prevent the deposit of mud or other extraneous material on the highway during the construction period.
(Section 4, NPPF)
6) Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.

Reason: To protect to the openness and visual amenity of the Green Belt.
(Section 9, NPPF)
7) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers RM16/024.2C & RM/16/024.1.

Reason: To identify the approved plans and to avoid doubt.