| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
The first floor window in the east facing front elevation of the development hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through it at all times and shall be non-opening, unless the parts of the window which can be opened are more than 1.7m above the floor of the room in which the window is installed.
Reason: To safeguard the privacy of occupiers of adjoining properties. (Policy DM3 of the Core Strategy and Development Management Policies (2009) and Section 7, NPPF) |
3)
No development shall take place until a landscaping scheme to include all hard and soft landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.
Reason: To ensure an acceptable standard of landscaping. (Sections 7 & 11, NPPF) |
4)
The proposed dwelling shall not be occupied until the alterations to the front boundary wall and gates, the widened access driveway and the parking and turning areas shown on drawing number 1612 PL-01 Rev A have been laid out, drained and surfaced in accordance with details previously submitted to and approved in writing by the Local Planning Authority and those areas shall not thereafter be used for any other purpose.
Reason: To provide a satisfactory means of access and to enable vehicles to draw off, park and turn clear of the highway to minimise conditions of danger, obstruction and inconvenience to users of the adjoining highway. (Section 4, NPPF). |
5)
Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 2015, or any amendments thereto, the garage accommodation on the site shall not be used for any purpose, other than as garage accommodation, unless permission has been granted by the Local Planning Authority on an application made for that purpose.
Reason: To retain off-street parking provision and thereby minimise the potential for on-street parking which could adversely affect the convenience of road users. (Section 4, NPPF). |
6)
No development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Section 7, NPPF) |
7)
No development shall take place until details of the existing and final ground and slab levels of the buildings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.
Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas. (Section 7, NPPF) |
8)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers PL-01 Rev A, PL-02, PL-03, Design and Access Statement, Tree Survey Report, Drawing Number 001 and CBC/001.
Reason: To identify the approved plans and to avoid doubt. |
|
|---|