| Conditions or Reasons: | 1)
The works shall begin not later than three years from the date of this consent.
Reason: To comply with Section 18 of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
None of the components, members or elements comprising the structural timber frame & fabric, including the infill panel material, stave or wattle & daub or brick, stone & plaster- of the building shall be cut, damaged, altered or otherwise detrimentally changed, other than those parts specifically identified within the submitted detailed annotated working drawings & precise schedule of works relating to the timber frame. All such alteration works shall be in accordance with usual conservation good practice & forming part of the agreed specification, method statement & approach stated in the listed building consent. Sandblasting or any other abrasive cleaning is not acceptable.
Reason: To ensure that the special architectural or historic interest of the building or structure, its character & appearance is properly preserved, maintained & enhanced, in accordance with standard conservation good practice. (Policy DM13 of the Core Strategy for the North and Section 12 of the NPPF). |
3)
This consent relates only to the details shown on the submitted plans, numbers 009D (Landscape Layout), 001C (Site Location Plan), Archaelogical Watching Brief 2016.14, 003 (Existing Floor Plan), 004 (Existing Elevations A-D), 005 (Existing Elevations E-H), 006B (Proposed Ground Floor Plan), 007 (Proposed First Floor Plan), 008 (Proposed Drainage Layout), 010A (Proposed Elevations A & B), 011A (Proposed Elevations C & D), 012A (Proposed Elevations E & F), 013A (Proposed Elevations G & H), Design & Access Statement, Conservation -Pictorial Record P-025, 014 (Window Schedule), Description of Works P-020, Remedials P-021, Construction Method P-022, Ecology Remedial Schedule P-026, Schedule of Finishes P-027 & Phase 1 Bat & Owl Survey Report, April 2012.
Reason: To identify the approved plans and to avoid doubt. |
|
|---|