Conditions or Reasons for Planning Application - CB/17/04520/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) The vision splay shall be provided on each side of the access drive and shall be 2.8m measured along the back edge of the new highway from the centre line of the anticipated vehicle path to a point 2.0m measured from the back edge of the footway into the site along the centre line of the anticipated vehicle path. The vision splay so described and on land under the dwelling occupier's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.

Reason: To provide adequate visibility between the existing road and the new access, and to make the access safe and convenient for the traffic which is likely to use it..
(Section 4, NPPF)
3) The proposed vehicular access shall be constructed and surfaced in accordance with details to be approved in writing by the Local Planning Authority for a distance of 10m into the site, measured from the highway boundary, before the access is first brought into use. Arrangement shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of the highway.
(Section 4, NPPF)
4) No development shall take place until a landscaping scheme detailing a replacement hedgerow clear of the required visibility splays has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and first use of the access (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping and to protect the character of the Conservation Area.
(Policy BE8, SBLPR and Sections 7, 11 & 12, NPPF)
5) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 200.00 Rev A & 200.01.

Reason: To identify the approved plans and to avoid doubt.