| Conditions or Reasons: | 1)
The development hereby permitted extends to the area edged in red on the attached Plan No. CB/17/04966/MW-1 and Drawing No. LB-0023 Rev B entitled 'Site Plan and Details' and except as may be modified by the following conditions shall be carried out in accordance with the following documents and drawings:
a) Planning Application Form dated 14 December 2016;
b) Planning Statement dated September 2017;
c) Drawing No. LB-0023 (Sheet 1 of 2) Rev B entitled 'Site Plan and Details';
d) Drawing No. LB-0023 (Sheet 2 of 2) Rev B entitled 'Plans and Elevation';
e) Specification Sheets for Sandvik QJ341 Crusher, Case Construction Hydraulic Excavator CX290B and DD75 dust suppression unit; and
f) Letter from Ashvale Haulage received by the Local Planning Authority on 11 June 2018.
Reason: To define the permission and for the avoidance of doubt. |
2)
No operations or activities, including the movement of HGVs into and off the site, shall take place except between the following hours: 07:00 to 18:00 hrs on Mondays to Fridays; and 07:00 to 13:00 hrs on Saturdays and no operations, except for essential maintenance, shall take place on Sundays, Public or Bank Holidays.
Reason: To minimise nuisance by reason of noise and vibration in accordance with MWLP Saved Policy GE18. |
3)
The types of waste that shall be imported to the site shall be restricted to non-hazardous concrete, bricks, stone and rubble.
Reason: To restrict the operations to those applied for and to protect the amenities of the surrounding area. |
4)
No processing or treatment of waste shall take place on site other than the crushing of concrete, bricks, stone and rubble.
Reason: To restrict the operations to those applied for and to protect the amenities of the surrounding area. |
5)
Plant used at the site shall be limited to one concrete crusher fed by one hydraulic excavator.
Reason: To restrict the operations to those applied for and to protect the amenities of the surrounding area. |
6)
No waste materials or processed materials shall be deposited or stored on site unless confined to the hatched area marked 'Crushing Operation of Material. Crusher Remaining within Crusher Area' or the aggregate storage bays as shown on Drawing No. LB-0023 Rev B (Sheet 1 of 2).
Reason: To enable the Local Planning Authority to exercise control over the development and to accord with MWLP Saved Policy GE18. |
7)
No material on the site shall be deposited, stored or processed at a height in excess of 3 metres. The crusher shall at all times be placed at ground level and not be sited on top of any stockpile of material.
Reason: To protect the amenities of neighbouring occupiers and to minimise disturbance or nuisance by reason of dust and noise in accordance with MWLP Saved Policy GE18. |
8)
A record of annual waste throughput and recycling levels shall be made available for inspection by the Local Planning Authority within 7 days of a written request.
Reason: To assist the Local Planning Authority in monitoring and forward planning of waste facilities. |
9)
No disposal of foul and surface water drainage off site shall take place unless in accordance with the details submitted by MLA Consulting dated 21 April 2008 as amended by details received on 26 August 2008 and 6 September 2008 and the additional information submitted on 15 September 2011.The drainage scheme shall be maintained in accordance with the approved details.
Reason: To ensure the satisfactory drainage of the site and to prevent pollution in accordance with MWLP Saved Policies GE17 and GE20. |
10)
No burning of waste shall take place on site.
Reason: To prevent disturbance to nearby land users by reason of fumes and odour in accordance with MWLP Saved Policy GE18. |
11)
No plant or machinery shall be used on site unless fitted and operated with efficient noise suppression equipment and all plant and machinery shall be maintained in accordance with the manufacturers' recommendations to reduce to a minimum the noise, dust and exhaust emissions.
Reason: To minimise disturbance or nuisance to nearby land users by reason of noise, dust and fumes in accordance with MWLP Saved Policy GE18. |
12)
All mobile plant shall only operate using white noise broadband reversing warning devices (or similar) rather than tonal devices.
Reason: To minimise disturbance or nuisance to nearby land users by reason of noise in accordance with MWLP Saved Policy GE18. |
13)
Facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound shall be at least equivalent to the capacity of the tank plus 10%. All filling points, vents, gauges and sight glasses shall be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework shall be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets shall be detailed to discharge downwards to the bund.
Reason: To prevent the possible contamination of water resources and in accordance with MWLP Saved Policies GE17 and GE20. |
14)
No heavy goods vehicle departing the site shall deposit mud or debris on the public highway.
Reason: In the interests of highway safety and in accordance with MWLP Saved Policy GE18. |
15)
Within three months of the date of this planning permission, a dust management plan shall be submitted to the Local Planning Authority for its approval in writing. Such a plan shall ensure that at all times emissions of dust from the site are monitored and recorded and that efficient measures are employed for dust suppression to minimise any such emission. Such techniques shall include, but not necessarily be restricted to, use of dust suppression techniques including use of the dust suppression unit, minimising drop heights, stockpile management and regular sweeping of the site. The development shall be carried out in full accordance with the dust management plan as may be approved.
Reason: To minimise disturbance or nuisance to nearby land users by reason of dust and in accordance with MWLP Saved Policy GE18. |
16)
Within three months of the date of this planning permission, a noise management plan shall be submitted to the Local Planning Authority for its approval in writing. Such a plan shall ensure that at all times emissions of noise from the site are monitored and recorded and that efficient measures are employed for noise suppression to minimise any such emission. Such techniques shall include, but not necessarily be restricted to, selection of equipment, barriers and complaint management. The development shall be carried out in full accordance with the noise management plan as may be approved.
Reason: To minimise disturbance or nuisance to nearby land users by reason of noise and in accordance with MWLP Saved Policy GE18. |
17)
The overnight parking of HGVs shall be restricted to a maximum of 10 HGVs all of which shall be directly associated with the operator. No HGV shall exit the site in reverse gear.
Reason: To minimise parking on the estate road serving the site in the interests of convenience and safety of users of the industrial estate; to ensure that all vehicles are able to manoeuvre in and out of the site in forward gear; to ensure that the parking of HGVs does not obstruct the daily operation of the site and to accord with Policy T2 of the emerging Central Bedfordshire Local Plan. |
|
|---|