<< Back to case
Conditions or Reasons for Planning Application - CB/17/05023/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) The development shall not be occupied or brought into use until the parking scheme shown on Drawing No.2917-L3C has been completed. The scheme shall thereafter be retained for this purpose.

Reason: To ensure provision for car parking clear of the highway.
(Section 4, NPPF)
3) The first floor windows in the east facing side elevations of Plot 3 and Plot 4 the development hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through it at all times and shall be non-opening, unless the parts of the windows which can be opened are more than 1.7m above the floor of the rooms in which the windows is installed. No further windows or other openings shall be formed in the east facing side elevation.

Reason: To safeguard the privacy of occupiers of adjoining properties
(Section 7, NPPF)
4) No development shall take place until a landscaping scheme to include all hard and soft landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Sections 7 & 11, NPPF)
5) No development shall take place until details of the existing and final ground and slab levels of the buildings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.

Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas.
(Section 7, NPPF)
6) Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to Plot 3 hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.

Reason: To control the external appearance of the building/s in the interests of the amenities of the area.
(Section 7, NPPF)
7) No dwelling hereby permitted shall be first occupied until the existing vehicle access has been reconstructed and all on site areas have been surfaced in tarmacadam or similar durable, porous but bound material and arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.

Reason: To avoid the carriage of extraneous material or surface water from the site into the highway so as to safeguard the interests of highway safety, in accordance with Policy DM3 of the Core Strategy and Development Management Policies (2009).
8) A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme [before the use hereby permitted is commenced / before the building(s) is/are occupied] and be thereafter retained.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
(Section 7, NPPF)
9) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 2917-L3C, 2917-P4B, 2917-P2B, 2917-P1, 2917-L1 and 2917-L2

Reason: To identify the approved plan/s and to avoid doubt.


Return to Search | Close WindowTop of Page